My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2012-2018
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HARLAN
>
10842
>
2300 - Underground Storage Tank Program
>
PR0505615
>
COMPLIANCE INFO_2012-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/20/2021 11:43:46 AM
Creation date
6/3/2020 9:58:54 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2012-2018
RECORD_ID
PR0505615
PE
2361
FACILITY_ID
FA0006898
FACILITY_NAME
RAMOS OIL-FRENCH CAMP
STREET_NUMBER
10842
Direction
S
STREET_NAME
HARLAN
STREET_TYPE
RD
City
FRENCH CAMP
Zip
95231
APN
19333028
CURRENT_STATUS
01
SITE_LOCATION
10842 S HARLAN RD
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0505615_10842 S HARLAN_2012-2018.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
516
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UST Program Inspection Report (10/29/2015) <br /> Item 103 <br /> The completed (signed, dated, and witnessed) COFR has been update in CERS and accepted by the <br /> regulator. <br /> Item 104 <br /> The UST tank information has been updated in CERS and accepted by the regulator. <br /> Item 106 <br /> The monitoring plan has been updated in CERS and accepted by the regulator. <br /> Item 107 <br /> The monitoring site plan was updated and accepted by the regulator. <br /> Item 125 <br /> This site has failed to submit proper paperwork to return to compliance sin October 30, 2014. Moving <br /> forward, Ramos Oil will make every effort to stay in compliance and immediately respond to any <br /> violations found during inspection within the allotted 30 day time frame. <br /> Item 201 <br /> Maintenance records from the last 3 years will be maintained on site by our maintenance staff in a <br /> designated binder inside the monitoring equipment room. <br /> Item 204 <br /> Monitoring plan accepted by regulator will be available in a designated binder on site as well as <br /> electronically. <br /> Item 205 <br /> A copy of the current UST operating permit will be available in the Environmental Compliance Binder on <br /> site. <br /> Item 207 <br /> From now on, Ramos Oil D.O. will inspect and complete all required inspection reports including but not <br /> limited to monthly D.O. reporting with attached alarm history. <br /> Item 208 <br /> From now on, Ramos Oil D.O. will consistently perform monthly D.O. inspection and reports. D.O. <br /> reports will be stored in the Environmental Compliance Binder on site. <br />
The URL can be used to link to this page
Your browser does not support the video tag.