Laserfiche WebLink
RECEIVED <br /> • NOV 0 7 2016 <br /> Appendix VI ENVIRONMENTAL HEALTH <br /> (Copies of Monitoring System Certification form and UST Monitoring Piot Plan available at hftp://www.watergg§M SES <br /> MONITORING SYSTEM CERTIFICATION <br /> For Use By Aff Junsdkdons Within the State of Ca/ifomia <br /> Authority Cited.Chapter 6.7,Health and Safety Code;Chapter 16, Division 3, Title 23, California Code of <br /> Regulations <br /> This form must be used to document testing and servicing of monitoring equipment.A separate certification or report must be prepared for <br /> each monitoring system control panel by the technician who performs the work. A copy of this form must be provided to the tank-system <br /> owner/operator. The owner/operator must submit a copy of this form to the local agency regulating UST systems within 30 days of test date. <br /> A. General Information <br /> Facility Name: _Ramos Oil Company Bldg.No.: <br /> site Address:_10842 S. Harlan Road city._French Camp zip: <br /> Facility Contact Person:_Steve Richardson Contact Phone No.:916-371-2570 <br /> Make/Model of Monitoring System:TLS-350 Date of Testing/Servicing:_10127/16 <br /> B. Inventory of Equipment Tested/Certified <br /> Check the approLnate boxes to indicates ific!guipment insl ectediserviced: <br /> Tank ID: 1 Diesel Tank ID: <br /> x In-Tank G_auging Probe. Model:_Mag 1 ❑ In-Tank Gauging Probe. Model: <br /> x Annular Space or Vault Sensor. Model: VR 303 ❑ Annular Space or Vault Sensor. Model: <br /> x Piping Sump I Trench Sensor(s). Model: VR 208 ❑ Piping Sump/Trench Sensor(s). Model: <br /> x Fill Sump Sensor(s). Model:_VR 20811 Fill Sump Sensor(s). Model: <br /> x Mechanical Line Leak Detector. Model: VMI LD 2000 ❑ Mechanical Line Leak Detector. Model: <br /> ❑ Electronic Line Leak Detector. Model: ❑ Electrons Line Leak Detector. Model: <br /> ❑ Tank Overfill/High-Level Sensor. Model: ❑ Tank (specify <br /> it/equipment <br /> Sensor. Model: <br /> ❑ Others ui ment and model in Section E on Page <br /> 2. ❑ Other(specify equipment type and model in Section E on Page 2). <br /> TanklD' TanklD: <br /> ❑ In-Tank Gauging Probe. Model: ❑ In-Tank Gauging Probe. Model: <br /> ❑ Annular Space or Vault Sensor. Model: ❑ Annular Space or Vault Sensor. Model: <br /> ❑ Piping Sump/Trench Sensor(s). Model: ❑ Piping Sump/Trench Sensor(s). Model: <br /> ❑ Fill Sump Sensor(s). Model: ❑ Fill Sump Sensor(s). Model: <br /> ❑ Mechanical Line Leak Detector. Model: ❑ Mechanical Line Leak Detector. Model: <br /> ❑ Electronic Line Leak Detector. Model: ❑ Electronic Line Leak Detector. Model: <br /> ❑ Tank Overfill l High-Level Sensor. Model: ❑ Tank Overfill/High-Level Sensor. Model: <br /> ❑ Other(specil equipment and model in Section E on Pa 2. ❑ Other(suipTent and model in Section E on Pa <br /> Dispenser ID:_1-2 Dispenser ID:_3.4 <br /> x Dispenser Containment Sensor(s). Model:_VR 208 x Dispenser Containment Sensor(s). Model: VR 208 <br /> ❑ Shear Valve(s). ❑ Shear Valve(s). <br /> ❑ Dispenser Containment F12atLsj and Chain(!;). ❑ Dispenser Containment Floats and Chain(s). <br /> Dispenser ID:_Satellite 1 Dispenser ID:_Satellite 4-5 <br /> x Dispenser Containment Sensor(s). Model: VR 208 x Dispenser Containment Sensor(s). Model: VR 208 <br /> ❑ Shear Valve(s). ❑ Shear Valve(s). <br /> ❑ Dispenser Containment FloatW and Chain(s). ❑ Dis enser Containment Floats and Chain(s). <br /> Dispenser ID:_Satellite_2-3 Dispenser ID:_5 <br /> x Dispenser Containment Sensor(s). Model: VR 208 x Dispenser Containment Sensor(s). Model: VR 208 <br /> ❑ Shear Vatve(s). ❑ Shear Valve(s). <br /> ❑ Disp2nser Containment Floats and Chains ❑ Disp2nser Containment Floats and Chain(s). <br /> 'if the facility contains more tanks or dispensers,copy this form. Include information for every tank and dispenser at the facility. <br /> C. Certification - I certify that the equipment identified in this document was inspectediserviced in accordance whit the manufacturers' <br /> guidelines. Attached to this Certification are information(e.g.manufacturers'checklists)necessary to verify that this information is correct <br /> and a Plot Pian showing the layout of monitoring equipment For any equipment capable of generating such reports,1 have also attached a <br /> copy of the report,(check all that apply): ❑System set-up ❑Alarm history report <br /> Technician Name(print):Gabe Garcia Signature: ./`�G � <br /> Certification No.: 842919 License.No.: 811471 <br /> Testing Company Name:_JP Petroleum Service Phone No.:(_916 372-5693 <br /> Testing Company Address:3065 Asante Lane, W. Sacto Ca 95691_ Date of Testing/Servicing:_10-27-16 <br /> Monitoring System Certification Page 1 of 4 12/07 <br /> 1 2/21/07 <br /> Po505u� <br />