Laserfiche WebLink
RECEIVED <br /> NOV 0 9 2015 <br /> Appendix V1 E'NVIRONMENT�, <br /> (Copies of Monitoring System Certification form and UST Monitoring Plot Plan available at httl,:/fv �r.v TR <br /> MONITORING IFI I <br /> For Use By All Jurisdictions Within the State of California <br /> Authority Cited: Chapter 6.7, Health and Safety Code;Chapter 16, Division 3, Title 23, California Code of <br /> Regulations <br /> This form must be used to document testing and servicing of monitoring equipment. A separate certification or report must be prepared for <br /> each monitoring system control panel by the technician who performs the work. A copy of this form must be provided to the tank system <br /> owner/operator. The owner/operator must submit a copy of this form to the local agency regulating UST systems within 30 days of test date. <br /> A. General Information <br /> Facility Name: _Ramos Oil Company Bldg.No.: <br /> Site Address:_10842 S. Harlan Road city:_French Camp zip: <br /> Facility Contact Person:_Steve Richardson Contact Phone No.:916-371-2570 <br /> Make/Model of Monitoring System:_TLS-350 Date of Testing/Servicing:_10/29/15 <br /> B. Inventory of Equipment Tested/Certified <br /> Check the appro riate boxes to indicates ecific equipment inspected/serviced: <br /> Tank ID: 1 Diesel Tank ID: <br /> x In-Tank_Gauging Probe. Model:_Mag 1 In-Tank Gauging Probe. Model: <br /> x Annular Space or Vault Sensor. Model: VR 303F, Annular Space or Vault Sensor. Model: <br /> x Piping Sump/Trench Sensor(s). Model:_VR 208 `= Piping Sump/Trench Sensor(s). Model: <br /> x Fill Sump Sensor(s). Model:_VR 208 Fill Sump Sensor(s). Model: <br /> x Mechanical Line Leak Detector. Model:_VMI LD 2000 Mechanical line Leak Detector. Model: <br /> Electronic Line leak Detector. Model: ❑ Electronic Line Leak Detector. Model: <br /> Tank Overfill/High-Level Sensor. Model: = Tank Overfill/High-Level Sensor. Model: <br /> L Other s eci equipment t e and model in Section E on Page 2). <br /> _- Other(specify equipment type and model in Section E on Page 2). <br /> TanklD: TanklD: <br /> In-Tank Gauging Probe. Model: In-Tank Gauging Probe. Model: <br /> _j Annular Space or Vault Sensor. Model: Annular Space or Vault Sensor. Model: <br /> Piping Sump/Trench Sensor(s). Model: Piping Sump/Trench Sensor(s). Model: <br /> Fill Sump Sensor(s). Model: Fill Sump Sensor(s). Model: <br /> Mechanical Line Leak Detector. Model: _'. Mechanical Line Leak Detector. Model: <br /> r; Electronic Line Leak Detector. Model: - Electronic Line Leak Detector. Model <br /> Tank Overfill/High-Level Sensor. Model: Tank Overfill/High-Level Sensor. Model: <br /> F] Others cify a ui men4 a and model in Section E on Pa e 2. Other(specify equipment a and model in Section Eon PaLe 2). <br /> Dispenser ID:_1-2 1 Dispenser ID:_3-4 <br /> x Dispenser Containment Sensor(s). Model:_VR 208 x Dispenser Containment Sensor(s). Model:_VR 208 <br /> I-,, Shear Valve(s). Shear Valve(s). <br /> C Dispenser Containment Floats and Chain(s). _ Dispenser Containment Floats and Chain(s). <br /> Dispenser ID:_Satellite 1 Dispenser ID:_Satellite 4-5 <br /> x Dispenser Containment Sensor(s). Model:_VR 208 x Dispenser Containment Sensor(s). Model:_VR 208 <br /> i-, Shear Valve(s). Shear Valve(s). <br /> -1 Dispenser Containment Floats and Chain(s). Dispenser Containment Float(s)and Chain(s). <br /> Dispenser ID:_Satellite 2-3 Dispenser ID:_5 <br /> x Dispenser Containment Sensor(s). Model: VR 208 x Dispenser Containment Sensor(s). Model:_VR 208 <br /> n Shear Valve(s). 1 i Shear Valve(s). <br /> n Dis enser Containment Float(s)and Chains Dispenser Containment Floats and Chains. <br /> "If the facility contains more tanks or dispensers,copy this form. Include information for every tank and dispenser at the facility. <br /> C. Certification - 1 certify that the equipment identified in this document was inspected/serviced in accordance with the manufacturers' <br /> guidelines. Attached to this Certification are information(e.g.manufacturers'checklists)necessary to verify that this information is correct <br /> and a Plot Plan showing the layout of monitoring equipment For any equipment capable of generating such reports,1 have also attached a <br /> copy of the report;(check all that apply): 4 System set-up V Alarm history report <br /> Technician Name(print):John PUumala Signatur <br /> Certification No.: A29358 e.No.: 811471 <br /> Testing Company Name:—JP Petroleum Service Phone No.:(_916--)_372-5693 <br /> Testing Company Address:3065 Asante Lane, W. Sacto Ca 95691_ Date of Testing/Servicing:_10-29-15 <br /> Monitoring System Certification Page 1 of 4 12!07 <br /> 1 2/21/07 <br />