My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2012-2018
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HARLAN
>
10842
>
2300 - Underground Storage Tank Program
>
PR0505615
>
COMPLIANCE INFO_2012-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/20/2021 11:43:46 AM
Creation date
6/3/2020 9:58:54 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2012-2018
RECORD_ID
PR0505615
PE
2361
FACILITY_ID
FA0006898
FACILITY_NAME
RAMOS OIL-FRENCH CAMP
STREET_NUMBER
10842
Direction
S
STREET_NAME
HARLAN
STREET_TYPE
RD
City
FRENCH CAMP
Zip
95231
APN
19333028
CURRENT_STATUS
01
SITE_LOCATION
10842 S HARLAN RD
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0505615_10842 S HARLAN_2012-2018.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
516
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
NOV0 RECEIVED <br /> 2015 <br /> Monitoring ye Certification <br /> Site Address: <br /> . . . . . . . . . . . . <br /> . • . . . . . . . . . . . . <br /> yp <br /> T r. . . . <br /> . . . . . . . . . . . . . . . . f <br /> : L . . . . . . . . . . . . . . . . . . . . . . . . . <br /> �- - - - - - - - - - - - - - - - cJ0. <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> - - . . . . . . . . . : : : : : : : : : : . . . . . <br /> . . . . . . . . . . . <br /> . : - � . . . . . . . . . . . . . . . . . . . . . . . . . : . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . <br /> � <br /> ®ate map s drawn:/ > � rz 2— <br /> Instmotions <br /> If you already have a diagram that shows all required Information, you may include it, rather than this page, with your Monitoring System <br /> Certification. On your site plan,show the general layout of tanks and piping. Clearly identify locations of the following equipment,if installed: <br /> monitoring system control panels; sensors monitoring tank annular spaces, sumps, dispenser pans, spill containers, or other secondary <br /> containment areas; Mechanical or electronic line leak detectors; and in-tank liquid level probes (if used for leak detection). In the spa <br /> ce <br /> provided,note the date this Site Plan was preparecL <br /> Monitoring System Certification Page 4 of 4 12A7 <br /> 2/21/®? <br />
The URL can be used to link to this page
Your browser does not support the video tag.