My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2012-2018
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HARLAN
>
10842
>
2300 - Underground Storage Tank Program
>
PR0505615
>
COMPLIANCE INFO_2012-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/20/2021 11:43:46 AM
Creation date
6/3/2020 9:58:54 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2012-2018
RECORD_ID
PR0505615
PE
2361
FACILITY_ID
FA0006898
FACILITY_NAME
RAMOS OIL-FRENCH CAMP
STREET_NUMBER
10842
Direction
S
STREET_NAME
HARLAN
STREET_TYPE
RD
City
FRENCH CAMP
Zip
95231
APN
19333028
CURRENT_STATUS
01
SITE_LOCATION
10842 S HARLAN RD
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0505615_10842 S HARLAN_2012-2018.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
516
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UST OPERATOR <br />i1RAOR MONTHLY RAMOS „r�, <br />INSPECTION <br />s�.-��torz coManrax <br />Note: Any answer of "N" should be explained in the comment section on the tonowing page, anu win require iunuw-up a�uvu. <br />Comments: �� C t� r <br />Items Requiring Follow -Up Action: '✓ <br />P.O. BOX 401, W SACRAMENTO, CA 95691 (300) 477-7266 <br />PAPERWORK HISTORY <br />Y <br />N <br />N/A <br />DATE <br />9 <br />Monitoring system certification has been completed within the past 12 months. <br />® <br />❑ <br />❑ <br />10-31-2012 <br />10 <br />Secondary containment tests have been completed within the past 36 months. <br />® <br />❑ <br />❑ <br />12-16-2011 <br />11 <br />Spill containment buckets have been tested within the past 12 months. <br />® <br />❑ <br />10-31-2012 <br />12 <br />Tank tightness testing was completed within the past 12 months <br />❑ <br />❑ <br />13 <br />Line tightness testing was completed within the past 12 months. <br />❑ <br />❑ 10 <br />14 <br />Other required testing/maintenance was completed within the required timeframe. <br />Test/Maintenance: <br />❑ <br />❑ <br />❑ <br />Test/Maintenance: <br />❑ <br />Test/Maintenance: <br />FACILITY EMPLOYEE TRAINING <br />❑ <br />❑ <br />❑ <br />Y N I N/A <br />15 <br />All facility employees have received the required on-the-job training within the past year. <br />® ❑ ❑ <br />16 <br />All facility employees hired within the past 30 days have received the required on-the-job training. <br />® ❑ ❑ <br />Note: Any answer of "N" should be explained in the comment section on the tonowing page, anu win require iunuw-up a�uvu. <br />Comments: �� C t� r <br />Items Requiring Follow -Up Action: '✓ <br />P.O. BOX 401, W SACRAMENTO, CA 95691 (300) 477-7266 <br />
The URL can be used to link to this page
Your browser does not support the video tag.