My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2012-2018
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HARLAN
>
10842
>
2300 - Underground Storage Tank Program
>
PR0505615
>
COMPLIANCE INFO_2012-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/20/2021 11:43:46 AM
Creation date
6/3/2020 9:58:54 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2012-2018
RECORD_ID
PR0505615
PE
2361
FACILITY_ID
FA0006898
FACILITY_NAME
RAMOS OIL-FRENCH CAMP
STREET_NUMBER
10842
Direction
S
STREET_NAME
HARLAN
STREET_TYPE
RD
City
FRENCH CAMP
Zip
95231
APN
19333028
CURRENT_STATUS
01
SITE_LOCATION
10842 S HARLAN RD
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0505615_10842 S HARLAN_2012-2018.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
516
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
v <br />i RAMOSy <br />Note: Any answer of "N" should he explained in the comment section on the following page, and will require follow-up action. <br />Comments: Site onneralina normal <br />Items Requiring Follow -Up Action: None <br />ALARM PRINT OUTS <br />T I, g F <br />6 5-9 <br />P.O. 13OX 401, W SACRAMI NTO, CA 95691 (800) 477-7266 <br />PAPERWORK HISTORY <br />Y I <br />N <br />N/A <br />DATE <br />9 <br />Monitoring system certification has been completed within the past 12 months. <br />® <br />❑ <br />❑ <br />10 <br />Secondary containment tests have been completed within the past 36 months. <br />® <br />❑ <br />❑ <br />I 1 <br />Spill containment buckets have been tested within the past 12 months. <br />® <br />❑ <br />❑ <br />12 <br />'rank tightness testing was completed within the past 12 months <br />® <br />❑ <br />❑ <br />13 <br />Line tightness testing was completed within the past 12 months. <br />® <br />❑ <br />❑ <br />14 <br />Source test completed within the last 12 months. <br />❑ <br />❑ <br />❑ <br />15 <br />Other required testing/maintenance was completed within the required timeframe. <br />'I'est/Maintenance: <br />❑ <br />❑ <br />fest/Maintenance: <br />FACILITY EMPLOYEE TRAINING <br />❑ <br />❑ <br />Y N N/A <br />16 <br />All facility employees have received the required on-the-job training within the past year. <br />® ❑ ❑ <br />17 <br />All facility employees hired within the past 30 days have received the required on-the-job training. <br />® ❑ ❑ <br />Note: Any answer of "N" should he explained in the comment section on the following page, and will require follow-up action. <br />Comments: Site onneralina normal <br />Items Requiring Follow -Up Action: None <br />ALARM PRINT OUTS <br />T I, g F <br />6 5-9 <br />P.O. 13OX 401, W SACRAMI NTO, CA 95691 (800) 477-7266 <br />
The URL can be used to link to this page
Your browser does not support the video tag.