My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2012-2018
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HARLAN
>
10842
>
2300 - Underground Storage Tank Program
>
PR0505615
>
COMPLIANCE INFO_2012-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/20/2021 11:43:46 AM
Creation date
6/3/2020 9:58:54 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2012-2018
RECORD_ID
PR0505615
PE
2361
FACILITY_ID
FA0006898
FACILITY_NAME
RAMOS OIL-FRENCH CAMP
STREET_NUMBER
10842
Direction
S
STREET_NAME
HARLAN
STREET_TYPE
RD
City
FRENCH CAMP
Zip
95231
APN
19333028
CURRENT_STATUS
01
SITE_LOCATION
10842 S HARLAN RD
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0505615_10842 S HARLAN_2012-2018.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
516
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Software Version Installed: ,123.02 <br />Isomplete [rre lull[Jm <br />H ulluum!lw6. <br />x Yes ❑ No' <br />Is the audible alar operational? <br />x Yes ❑ No' <br />Is the visual alar operational? <br />x Yes o No' <br />Were all sensors visually inspected, functionally tested, and confirmed operational? <br />x Yes ❑ No' <br />Were all sensors installed at lowest point of secondary containment and positioned so that other equipment will not interfere with their <br />proper o ration? <br />u Yes ❑ No" <br />If alarms are relayed to a remote monitoring station, is all communications equipment (e.g. modem) operational? <br />x N/A <br />❑ Yes ❑ No' <br />For pressurized piping systems, does the turbine automatically shut down if the piping secondary containment monitoring system <br />U NIA <br />detects a leak, fails to operate, or is electrically disconnected? If yes: which sensors initiate positive shut -down? (Check all that apply) <br />❑ Sump/Trench Sensors; n Dispenser Containment Sensors. Did you confirm positive shut -down due to leaks and sensor <br />failure/disconnection? ❑ Yes; ❑ No. <br />x Yes r: No' <br />For tank systems that utilize the monitoring system as the primary tank overfill warning device (i.e. no mechanical overfill prevention <br />❑ NIA <br />valve is installed), is the overfill warning alarm visible and audible at the tank fill point(s) and operating properly? If so, at what percent <br />of tank ca a ' does the alarm tri eO % <br />x Yes* n No <br />Was any monitoring equipment replaced? If yes, identify specific sensors, probes, or other equipment replaced and list the <br />manufacturer name and model for all replacement parts in Section E, below. <br />❑ Yes' x No <br />Was liquid found inside any secondary containment systems designed as dry systems? (Check all that apply) ❑ Product; n Water. If <br />es, describe causes in Section E, below. <br />x Yes oi No" <br />Was monitoring system set-up reviewed to ensure proper settings? Attach set up reports, if applicable <br />x Yes ❑ No' <br />Is all monitoring equipment operational per manufacturer's specifications? <br />" In Section E below, describe now and when mese dencienwea were ur wul ue wl <br />E. Comments: —New Veeder Root TLS — 350, removed Incon TS -1000 and sensors <br />Monitoring System Certification Page 2 of 4 <br />12107 <br />2 2/21/07 <br />
The URL can be used to link to this page
Your browser does not support the video tag.