Laserfiche WebLink
October 15, 2012 <br />JoaquinSan r <br />EnvironmentalDepartment <br />1868 East Hazelton <br />John Puumala <br />JP Petroleum Services <br />3065 Asante Lane <br />West Sacramento, CA, 95691 <br />Phone:I" 468-3420 <br />1• 464-0138 <br />Re: Ramos Oil Inc — French Camp <br />10842 South Harlan Road, French Camp, 95231 <br />DIRECTOR <br />Donna Heran, REHS <br />PROGRAM COORDINATORS <br />Robert McClellon, REHS <br />Jeff Carruesco, REHS, RDI <br />Kasey Foley, REHS <br />Linda Turkatte, REHS <br />SR0065874 <br />The San Joaquin County Environmental Health Department (EHD) has completed the review of <br />the application for a permit to replace existing Incon TS -1000 and sensors with a Veeder-Root <br />TLS 350 monitoring system: VR 208 liquid sensor in the STP & Fill sumps and the six UDCs, <br />VR 303 dual -float hydrostatic reservoir sensor in the annular, VR mag probe for inventory on the <br />underground storage tank (UST) system at the above noted address. The permit has been <br />approved with the following conditions: <br />1. Contact the local fire department and the San Joaquin Valley Air Pollution Control <br />District for any applicable permits and requirements. <br />2. Any changes in information and scope of work must be submitted to EHD for approval <br />prior to commencing work. All new addenda supersede the previous ones. <br />3. Contact Thuy Tran 'at (209) 468-8257 to arrange the following inspection appointments <br />(a 48-hour notice is .required for inspection appointments). Please be aware that <br />inspections for emergency work must be scheduled within five days of permit approval. <br />a. Sensor functionality: Functionality of the monitoring system must be verified to <br />ensure that monitoring has been restored to meet the requirements of Title 23 <br />California Code of Regulations and the Health & Safety Code. <br />b. Overfill prevention verification: Verify that the mag probe correctly reads inventory <br />Please be aware that the facility cannot operate the UST system prior to the EHD <br />inspection and approval. <br />4. Update and submit a copy of the "UST Monitoring Plan" for EHD approval. An approved <br />copy will be returned for on site records. <br />5. Qualified service technicians must possess or work under the direct and personal <br />supervision of an individual physically present at the work site who possesses all of the <br />following: <br />