Laserfiche WebLink
�� <br /> 0 �� <br /> l07cThe correct map was uploaded to[ERS1O/2O/2DI7. The location ofthe annular sensor is <br /> consistent with our diagram from Walton Engineering and was confirmed by our maintenance manager <br /> 121'This report isbeing submitted within the 3Oday window. Ramos oil will comply with the 3Oday <br /> time frame. <br /> 201-Attached is the form for the"Recording Requirements for Unauthorized Releases"we were <br /> instructed tocomplete bythe inspector <br /> 204-The approved copy of the monitoring plan can be found in the Environmental Compliance binder <br /> mnsite,available for inspection. <br /> 2O8-The third party designated operator has been instructed tocomplete the inspections <br /> pmnperh'' <br /> 210`Copies ofthese DOreports were sent tmMichelle Henry SJEHD. <br />