My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2012-2018
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HARLAN
>
10842
>
2300 - Underground Storage Tank Program
>
PR0505615
>
COMPLIANCE INFO_2012-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/20/2021 11:43:46 AM
Creation date
6/3/2020 9:58:54 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2012-2018
RECORD_ID
PR0505615
PE
2361
FACILITY_ID
FA0006898
FACILITY_NAME
RAMOS OIL-FRENCH CAMP
STREET_NUMBER
10842
Direction
S
STREET_NAME
HARLAN
STREET_TYPE
RD
City
FRENCH CAMP
Zip
95231
APN
19333028
CURRENT_STATUS
01
SITE_LOCATION
10842 S HARLAN RD
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0505615_10842 S HARLAN_2012-2018.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
516
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The following is an itemized list of underground storage tank violations that have not <br /> been addressed for RAMOS OIL-FRENCH CAMP as of April 04, 2018. <br /> Open violations from October 25, 2017 inspection <br /> Violation #121 -Failed to submit a written response within 30 days of receiving an inspection report. <br /> An inspection was last done on October 27,2016 and an inspection report was issued identifying information to be <br /> submitted to bring this site into compliance. This information was required to be submitted by November 26,2016. <br /> An operator that receives an inspection report shall have 30 days to submit a written response that includes a <br /> statement documenting corrective actions taken or proposing corrective actions which will be taken. Ensure that a <br /> written response documenting corrective actions taken or proposed is submitted within 30 days of receiving an <br /> inspection report. <br /> Violation #201 -Failed to maintain alarm logs and/or records of follow up actions. <br /> Maintenance and monitoring records for the last three years were not found on site. <br /> The 2016 annual spill bucket and line leak detector test results were not available for review during the time of <br /> inspection. <br /> On the July 2017 monthly designated operator(DO) report, the DO mentioned that the filter piping was leaking <br /> which was triggering an 1-7: master dispenser 3-4 alarm. The DO noted that a"Ramos Mechanic"came out to the <br /> site to fix the leak. There were no work orders or logs found on site documenting the repair. Immediately submit <br /> documents showing how the leak was fixed and what was done with the waste to the EHD. <br /> On October 20, 2017, there was an 1-2: diesel stp sump fuel alarm that occurred. According to Joy Kachadorian, <br /> Ramos should have come to the site to investigate the alarm. There were no records on site indicating how the <br /> alarm was handled. Immediately submit documents to EHD showing how the alarm was handled. <br /> These records shall be maintained on site for at least three years. Monitoring records include: (1) date and time of <br /> all monitoring or sampling; (2) monitoring equipment calibration and maintenance records; (3) results of any visual <br /> observations; (4) results of sample analysis performed a lab or in the field; (5) logs of all readings of gauges or other <br /> monitoring equipment, ground water elevations, or other test results; (6) results of inventory readings and <br /> reconciliations. Immediately locate and maintain the above mentioned maintenance records and send them to the <br /> EHD. <br /> Violation #204-Current monitoring plan approved by the EHD not found on site. <br /> An approved copy of the monitoring plans were not available for inspection. A copy of these plans shall be <br /> accessible on site at all times. Immediately locate and retain a copy on site. <br /> Violation #209 -Designated operator did not inspect all required items and/or the inspection reports not <br /> completed. <br /> The designated operator failed to review all of the liquid sensor alarms from the alarm history on the 5/31/2017 <br /> designated operator monthly inspection report and failed to check that they were responded to appropriately. <br /> The L8 satellite dispenser pan 4-5 alarm was missing from the attached print out. During the monthly inspection, the <br /> designated <br /> operator shall review the alarm history for the previous month, check that each alarm was documented and <br /> responded to appropriately, and attach a copy of the alarm history with documentation taken in response to any <br /> alarms to the monthly report. Ensure that designated operators performing monthly inspections at this facility are <br /> including all of the required information on the reports <br /> Violation #210 -Designated operator monthly inspection reports not maintained on site for at least 12 <br /> months. <br /> The October 2016, November 2016, December 2016, January 2017, February 2017, March 2017 and April 2017 <br /> designated operator monthly inspection reports were not found on site. Designated operator monthly inspection <br /> reports for the previous twelve months shall be retained on site. Locate and ensure that copies of the previous <br /> twelve months of designated operator monthly inspection reports are maintained on site. Submit copies to the EHD. <br /> Page 1 of 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.