My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2012-2018
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HARLAN
>
10842
>
2300 - Underground Storage Tank Program
>
PR0505615
>
COMPLIANCE INFO_2012-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/20/2021 11:43:46 AM
Creation date
6/3/2020 9:58:54 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2012-2018
RECORD_ID
PR0505615
PE
2361
FACILITY_ID
FA0006898
FACILITY_NAME
RAMOS OIL-FRENCH CAMP
STREET_NUMBER
10842
Direction
S
STREET_NAME
HARLAN
STREET_TYPE
RD
City
FRENCH CAMP
Zip
95231
APN
19333028
CURRENT_STATUS
01
SITE_LOCATION
10842 S HARLAN RD
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0505615_10842 S HARLAN_2012-2018.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
516
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB,January 2002 Page_of <br /> 6. PIEPING SUMP TESTING <br /> Test Method Developed By: 0 Sump Manufacturer 0 Industry Standard X Professional Engineer <br /> 0 Other(Specify) <br /> Test Method Used: 0 Pressure 0 Vacuum X Hydrostatic <br /> 0 Other(Specify) <br /> ,I Test Equipment Used: Caldwell Systems Equipment Resolution: .005/30 min <br /> Sump#I Sump# Sump# Sump# <br /> Sump Diameter: 42" <br /> Sump Depth: 55" <br /> Sump Material: Fiberglass <br /> Height from Tank Top to Top of 17" <br /> Highest Piping Penetration: <br /> Height from Tank Top to Lowest 2411 <br /> Electrical Penetration: <br /> Condition of sump prior to testing: Dry <br /> Portion of Sump Tested' 2"above Highest piping penetration <br /> Does turbine shut down when <br /> sump sensor detects liquid(both x Yes 0 No 0 NA 0 Yes 0 No 0 NA 0 Yes 0 No 0 NA 0 Yes 0 No 0 NA <br /> product and water)?' <br /> Turbine shutdown response time <br /> Is system programmed for fail-safe x Yes 0 No 0 NA 0 Yes 0 No 0 NA 0 Yes 0 No 0 NA 0 Yes 0 No 0 NA <br /> shutdown?* <br /> Was fail-safe verified to be 0 Yes x No 0 NA 0 Yes 0 No 0 NA 0 Yes 0 No 0 NA 0 Yes 0 No 0 NA <br /> operational?* <br /> Wait time between applying <br /> I pressure/vacuum/water and starting 5 min 5 min 5 min 5 min <br /> test: <br /> Test Start Time: 8:45 <br /> Initial Reading(RI): .001, .0019 .0019 .0019 <br /> Test End Time: 9:15 <br /> Final Reading(RF): .00 <br /> Test Duration: 30 min 30 min 30 min 30 min <br /> Change in Reading(RF-RI): .00 <br /> Pass/Fail Threshold or Criteria: .005/30 min .005/30 min .005/30 min .005/30 min <br /> Test Result: x Pass 0 Fail 0 Pass 0 Fail 0 Pass 0 Fail D Pass 0 Fail <br /> Was sensor removed for testing? x Yes 0 No 0 NA x Yes 0 No 0 NA x Yes 0 No 0 NA 0 Yes 0 No 0 NA <br /> Was sensor property replaced and x Yes 0 No 0 NA x Yes 0 No 0 NA x Yes 0 No 0 NA 0 Yes 0 No 0 NA <br /> verified functional I I <br /> Comments—(include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> KMCIVEW <br /> AN 0 8- 211112 <br /> ENVIROMENTAL HEALTH <br /> PERMMMRVICES <br /> If the entire depth of the sump is not tested,specify how much was tested. If the answer to ggy of the questions indicated with an <br /> asterisk(*)is"NO"or"NA",the entire sump must be tested. (See SWRCB LG-160) <br />
The URL can be used to link to this page
Your browser does not support the video tag.