Laserfiche WebLink
. I <br /> SVv'RCB,January 2002 Page_of <br /> 7. UNDER-DISPENSER CONTAINMENT QLDC)TESTING <br /> Test Method Developed By: 0 UDC Manufacturer 0 industry Standard X Professional Engineer <br /> 0 Other(Specify) <br /> Test Method Used: 0 Pressure El Vacuum X Hydrostatic <br /> 0 Other(Specify) <br /> Test Equipment Used: Caldwell Systems Equipment Resolution: .005/30 min <br /> UDC#4A-5A UDC#5 UDC# UDC# <br /> UDC Manufacturer: Unknown Unknown <br /> UDC Material: Fiberglass Fiberglass <br /> UDC Depth: 36" 3697 <br /> Height from UDC Bottom to Top 811 811 <br /> of Highest Piping Penetration: <br /> Height from UDC Bottom to 6" 6" <br /> Lowest Electrical Penetration: <br /> Condition of UDC prior to Dry Dry <br /> testing: <br /> Portion of UDC Tested[ 2"above Highest Piping Penetration <br /> Does turbine shut down when <br /> UDC sensor detects liquid(both xYes DNo DNA xYes DNo DNA 0 Yes 0 No DNA 0 Yes 0 No 0 NA <br /> product and water)?* <br /> Turbine shutdown response time <br /> Is system programmed for fail- <br /> safe shutdown?* x Yes 0 No 0 NA x Yes 11 No El NA 0 Yes 0 No 0 NA 0 Yes 0 No 0 NA <br /> Was fail-safe verified to be 0 Yes xNo DNA DYes xNo OxNA 0 Yes 0 No 0 NA 0 Yes 0 No 0 NA <br /> operational?* <br /> Wait time between applying <br /> pressure/vacuum/water and 5 min 5 min 5 min 5 min <br /> starting test <br /> Test Start Time: 9:20 9:10 <br /> Initial Reading(RI). .0017 .0019 .0017 .0019 <br /> Test End Time: 9:50 9:40 <br /> Final Reading(RF): .00 .00 <br /> Test Duration: 30 min 30 min 30 min 30 min <br /> Change in Reading(RF-R,): .00 .00 <br /> Pass/Fail Threshold or Criteria: .005/30 min .005/30 min .005/30 min .005/30 min <br /> Test Result: x Pass 0 Fail x Pass 0 Fail 0 Pass 0 Fail 0 Pass 0 Fail <br /> Was sensor removed for testing? xYes ONo DNA xYes ONo DNA x Yes D No 0 NA x Yes 0 No 0 NA <br /> Was sensor properly replaced and xYes ONo DNA xYes 0No DNA x Yes 0 No 0 NA x Yes 0 No 0 NA <br /> verified functional after testin ? g I I <br /> Comments—(include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> ocr ivi;n <br /> %&=WMAIN I W &M RAW <br /> JAN 0 8 2018 <br /> Lllfi[3f'%A I RAI-&I�A I <br /> PER <br /> If the entire depth of the UDC is not tested,specify how much was tested. If the answer to gny of the questions indicated with an <br /> asterisk(*)is"NO"or"NA",the entire UDC must be tested. (See SWRCB LG-160) <br />