My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2009-2018
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WILSON
>
437
>
2300 - Underground Storage Tank Program
>
PR0506406
>
COMPLIANCE INFO_2009-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/17/2023 3:32:05 PM
Creation date
6/3/2020 9:58:56 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2009-2018
RECORD_ID
PR0506406
PE
2361
FACILITY_ID
FA0002313
FACILITY_NAME
WILSON WAY CHEVRON
STREET_NUMBER
437
Direction
N
STREET_NAME
WILSON
STREET_TYPE
WAY
City
STOCKTON
Zip
95205
APN
15113052
CURRENT_STATUS
01
SITE_LOCATION
437 N WILSON WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0506406_437 N WILSON_2009-2018.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
439
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UNIFIED PROGRAM CONSOLIDATED FORM <br /> UNDERGROUND STORAGE TANK <br /> MONITORING PLAN-LtLe I oft 490-1 <br /> TYPE OF ACTION 0 1.NEW PLAN 2.CHANGE OF INFORMATION <br /> PLAN TYPE 44 1,MONITORING IS IDENTICAL FOR ALL USTs AT THIS FACILITY. 4942 <br /> (Check one item only) 0 2.THIS PLAN COVERS ONLY THE FOLLOWING UST SYSTEM(S)- <br /> 1. FACILITY INFORMATION <br /> FACILITY ID#(Agency Use Only) <br /> BUSINESS NAME(Same as FACILITY NAME) 3, <br /> BUSINESS SITE ADDRESS 103. 1 CITY 104. <br /> IL EQUIPMENTTESTINGAND PRIXENTIVE MAINTENANCE <br /> Testing,preventive maintenance,and calibration of monitoring equipment(e.g.,sensors,probes,line leak detectors,etc,)must be performed at the frequency <br /> specified by the equipment manufacturers'instructions,or annually,whichever is more frequent,and that such work must he performed by qualified personnel. <br /> _2LCC�R. 2632,�2634,2639,26412 <br /> 490-33ba <br /> 90- <br /> MONITORING EQUIPMENT IS SERVICED 1.ANNUALLY 0 99.OTHER(Specify): 4 <br /> 111.MONITORING LOCATIONS <br /> 0 1.NEW SITE PLOT PLAN/MAP SUBMITTED WITH THIS PLAN.y 2.SITE PLOT PLAN/MAP PREVIOUSLY SUBMITTED. (23 CCR§2632, <br /> 2634)4w4 <br /> IV.TANK MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S): <br /> 1.CONTINUOUS ELECTRONIC TANK MONITORING OF ANNULAR(INTERSTITIAL)SPACE(S)OR SECONDARY CONTAINMENT 4945 <br /> VAULT(S)WITH AUDIBLE AND VISUAL ARMS. (23 CCR§2632,2634) <br /> SECONDARY CONTAINMENT IS: O!La-DRY 0 b.LIQUID FILLED 0 c.PRESSURIZED 0 d,UNDER VACUUM 49D.6 <br /> ----------------------- <br /> 1 <br /> PANEL MANUFACTURER: 490-7. MODEL#: 3�_Vo 490-8 <br /> 49040 <br /> LEAK SENSOR MANUFACTURER: MODEL#(S): <br /> 0 2.AUTOMATIC TANK GAUGING(ATG)SYSTEM USED TO MONITOR SINGLE MALL TANK(S).(23 CCR§2643) 490-11 <br /> PANEL MANUFACTURER: 49 <br /> 12. MODEL#: 490-13 <br /> IN-TANK PROBE MANUFACTURER: 490-14 MODEL#(S): 490-15 <br /> LEAK TEST FREQUENCY: El a.CONTINUOUS ❑ b.DAILY/NIGHTLY ❑ e.WEEKLY 49416 <br /> d.MONTHLY ❑ e,OTHER(Specify): 490-17 <br /> ------------------------------- <br /> PROGRAMMED - <br /> TESTS: [I a.0.1&pA ❑F-1 b.0.2 g.p.h. ❑[I c.OTHER(Specify): 490-19 <br /> 3.MONTHLY STATISTICAL INVENTORY RECONCILIATION(23 CCR§2646.1): 49420 <br /> 490-21 <br /> C34.WEEKLY MANUAL TANK GAUGING(,MTG)(23 CCR§2645). TESTING PERIOD: C] a.36 HOURS ❑ b.60 HOURS 4%-22 <br /> 0 5.TANK INTEGRITY TESTING(23 CCR§2643.1): 41�)O 23 <br /> 490-24 <br /> TEST FREQUENCY: ❑El a.ANNUALLY ❑[I b.BIENNIALLY ❑M c.OTHER(Specify): 49425 <br /> 490-26 <br /> ❑99.OTHER (Specify): 490-27 <br /> V.PIPE MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S)(Check all that apply) <br /> Z91.CONTINUOUS MONITORING OF PIPE/PIPING SUMP(S)AND OTHER SECONDARY CONTAINMENT WITH AUDIBLE AND 490-28 <br /> VISUAL ALARMS. (23CCR§2636) <br /> SECONDARY CONTAINMENT IS:Wa.DRY [3b.LIQUID FILLED Cle-PRESSURVED Eld.UNDER VACUUM ........ 490-29 <br /> : 490-31 <br /> PANEL MANUFACTURER: 'Zw-r- 49430 : MODEL#: <br /> LEAK SENSOR MANUFACTURER: 490-, 1 MODEL#(S)- 490-33 <br /> PIPING LEAK ALARM TRIGGERS AUTOMATIC PUMP(i.e.,TURBINE)SHUTDOWN. a.YES [I b.NO 490-34 <br /> FAILURE/DISCONNECTION OF THE MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. a.YES Ob.NO 490-35 <br /> 2. CAL LINE LEAK DETECTOR(MLLD)THAT ROUTINELY PERFORMS 3.0 g.p.h. EAK TESTS AND RESTRICTS OR SHUTS OFF,,, <br /> PRODUCT WHEN A LEAK IS DETECTED(23 CCR§2L36A >4ff11 <br /> MLLDMANUFACTURER(S): 490-37 If MODEL j(S)7 <br /> ❑ 3.ELECTRONIC LINE LEAK DETECTOR(ELLD)THAT ROUTINELY PERFORMS 3.0 g.ph.LEAK TESTS (13 CCR§2636) 490-39 <br /> : <br /> ELLD MANUFACMANUFACTURERS) 490-40. <br /> S) ; MODEL#(S): 49041 <br /> PROGRAMMED IN LINE LEAK TEST: F1 1.MINIMUM MONTHLY 0.2 g.p.h. El 2.MINIMUM ANNUAL 0.1&p.h. <br /> ELLD DETECTION OF A PIPING LEAK TRIGGERS AUTOMATIC PUMP SHUTDOWN. 0 a.YES C1 b.NO 490-431 <br /> ELLD FAILURE/DISCONNECTION TRIGGERS AUTOMATIC PUMP SHUTDOWN. 0 a.YES 0 b,NO 490-44 <br /> C] 4,PIPE INTEGRITY TESTING 49045 <br /> TEST FREQUENCY El a,ANNUALLY 0 b.EVERY 3 YEARS [I c.OTHERS 494.46 490-47 <br /> El 5.VISUAL PIPE MONITORING. 490-48 <br /> FREQUENCY C3 a-DAILY [I b.WEEKLY El c.MIN-MONTHLY&EACH TIME SYSTEM OPERATED' 49049 <br /> *Allowed for monitainr of unburied emergemy Serem"fuer p'Ving oniy pa W§25281_ b 3) <br /> C3 &SUCTION PIPING MEETS EXEMPTION CRITERIA 123 CCR§2636(a)(3)]. 490-50 <br /> rl 7,NO REGULATED PIPING PER HEALTH AND SAFETY CODE,DIVISION 20,CHAPTER 6.7 IS CONNECTED TO THE TANK SYSTEM <br /> 490-11 <br /> 2 <br /> (Specify) 4 490-90-553 <br /> UPCIF UST-D(1212007)114 <br />
The URL can be used to link to this page
Your browser does not support the video tag.