Laserfiche WebLink
03/23/2015 5:45AM FAX 1825 71 Guadalupe Sanchez IR0004/0010 <br /> Monitoring System Certification <br /> UST Monitoring Site Plan <br /> Bite Address: W1 W4 1-0 Y/ll.�� 11W f`o 15"?ti� . <br /> 00 : . . : : : : : : : : : : : : . <br /> y . . . . . . . . . . . <br /> IV L <br /> NT <br /> L I <br /> 1 $'f+fi�^�.hlaM . . . . . . . . . . . . . . . . . <br /> : : : : : : : : : : . . . . . . . . . . . . . . . . .I3 1D, 2.1.7,;_a4 t. . . . . . . . . <br /> Date map was drawn: <br /> lAstructlona, <br /> If you already have a diagram that shows all required information, you may include it, rather than this page,with your Monitoring System <br /> Cartification. On your site plan,show the general layout of tanks and piping. Clearly identifylocations of the following equipment,if Installed: <br /> monitoring system control panels; sensors monitoring tank annular spaces, sumps, dispiriser pans, spill containers, or other secondary <br /> containment areas; mechanical or electronic line leak detectors; and in-tank liquid level probes (if used for leak detection). In the apace <br /> provided,note the date this Site plan was prepared. <br /> Monitoring.system Certification Pape 4 of 4 12/07 <br /> 4 2/21/07 <br />