Laserfiche WebLink
JONIFIED PROGRAM CONSOLIDATED FO <br /> UNDERGROUNDSTORAGETANK <br /> MONITORING PLAN-(page 1 of 2) <br /> TYPE OF ACTION 1.NEW PLAN 5 2CHANGE OF INFORMATION 490.1 <br /> PLAN TYPE I.MONITORING IS IDENTICAL FOR ALL USTS AT THIS FACILITY. 0-90-2 <br /> (Check one item only) ❑ 2.THIS PLAN COVERS ONLY THE FOLLOWING UST SYSTEM <br /> I. FACILITY INFORMATION <br /> FACILITY ID#(Agelic),Use on'59 <br /> BUSINESS NAME(Sam as FACILITY NAME) 3. <br /> BUSINESS SITE ADDRESS 103. <br /> CITY 104. <br /> A-1 <br /> H•;� MNT TESTINGAND PREVE IVE M�AINTE ANCE <br /> Testing,preventive maintenance,and calibration or monitoring equipment(e.g.,sensors,probes,line leak detectors,etc.)must be performed at the frequency <br /> specified by the equipment manuftturers,instructions,or annually,whichever is more23 CCR '2632,2634.2638,2641 frequent,and that such work must be Performed by qualified personnel, <br /> MONITORING EQUIPMENT IS SERVICED %LANNUALLY0 99.OTHER(Specify): 490.3b <br /> a <br /> III.MONITORING LOCATIONS 490-3 <br /> U 1.NEW SITE PLOT PLAN/NIAP SUB ITTED WITHTHIS PLAN.M 2.SITE PLOT PLAN/MAP PREVIOUSLY SUBMITTED. (23 CCR§2632, <br /> 2630490-4 <br /> IV-TANK MONITORING IS PERFORMED USING THE FOLLOVVING METHOD(S): <br /> ja 1.CONTINUOUS ELECTRONIC <br /> MONITORINGl ANNULAR 'S IT <br /> VAULT(S)WITH AUDIBLE AND Vill )OR SECONDA 'CONTAINMENT 4190M <br /> VISUAL ALARMS (23 CCR k2632,2634) <br /> --SECONDARY CONTAINMENT IS: )9&DRY ❑ b.LIQUID FILLED 0 c.PRESSURIZED [I d.UNDER VACUUM 490-6 <br /> PANEL MANUl�E-W-.-- r-•---------------------- <br /> 490-7 �-31G 490.9 <br /> �Lj ;�----------------------------------------------- <br /> _±�ODEL L <br /> LEAK SENSOR ------0 <br /> S 0 ................... <br /> LEAK SENSOR MANUFACTURE <br /> 490-9. <br /> 2 AUTOMATIC ICT MODEL#(S <br /> AUTOMATIC Al K GAUGING(ATG)SYSTEM USED 0 MONITOR MagLEMALIl�'J"L#( <br /> TA <br /> PANEL MANUFACTURER: 4WIX IIIS (23 CCR§2643) 490-11 <br /> IN-TANK PROBE MANUFACTURi-P1--. -- 4�114. MODEL _---------------------- ------__•-•^_490-1 3 <br /> #(S): 4-15 <br /> 0 ...... <br /> ----------------- <br /> LEAK TEST FREQUENCY: 0 a.CONTINUOUS b.DAILY/NIGHTLY.. c.WEEKLY �W <br /> ❑ 4 <br /> MONTHLY <br /> 9 <br /> -------------------- ❑0 e-OTHER(Specify): 49-0-17 <br /> - PROGRAMMED TESTS: E] a.0.1 g.p.h. 0 b.0.2 gp.h. c.OTHER(Specify): 490-18 <br /> 4lill <br /> LEI 3.MONTHLY STATISTICAL INVENTORY RECONCILIATION(23 CCR§26".1): '�."'o <br /> 490-20 <br /> 0 4.WEEKLY MANUAL TANK GAUGING(1(23 CCR§2645). TESTING PERIOD. 0 &36 HOURS ❑ b.60 HOURS 490-2 <br /> 0 5.TXNK-IN-TEGRITY�TEsTiNLi(23CCR§2643.1): 490-22 <br /> TEST FREQUENCY: 0 a.ANNUALLY 0 b.BIENNIALLY 0 C.OTHER 490-23(Specify): 490-24 <br /> 0 99.OTHER (Specify): 490-25 <br /> 490-26 <br /> V.PIPE MONITORING IS PERFORMED USING TME FOLLOWING METHOl(Check all that apply) 490-27 <br /> ;�Ill::::PIPE!;rPIPING <br /> I�::�l <br /> VISUAL <br /> MONril ill'i lu 1 :11 1 1 ll l 1 i AND O-T-HE <br /> F ME,_-TlDRSECON <br /> A ALA S. (23 CCR§2636) %-UfNIAIA1Wjrj,%j WITH AUDIBLE AND 490-19 <br /> SECONDARY CONTAINMENT IS: DRY <br /> LIQUID FILLED Ele-PRESSURIZED OcLUNDER VACUUM 4910-29 <br /> PANEL MANUFACTURER <br /> --------•••__--..._.------------- ------------ 490-31 <br /> 50 30 <br /> : MODEL#:-T-i <br /> LEAK SENSOR MANUFACTURER: F <br /> PIPING LEAK ALARM TRIGGERS AUTOMATIC PUMP(i.e.,TURBINE)SHU�OWN7MODEL#(S): 490-33--- 490-34 <br /> FAILURE-MISCONNECTION OF THE MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP Ms.YES Ej-b,.-N----0----------------- <br /> � I i�I i I l(RILED}i 1, ]1 1!, 1 <br /> 2. L LINE LEAK Ill lz :;:' :�: SHUTDOWN. XiL YES [I b.No 490-35 <br /> 1 11! -Jmrumwx-'5 J-u 9-P.h. ❑ <br /> LEAK TESTS <br /> PRODUCT low WHEN A LEAK IS DETECTED RESTRICTS OR SHUTS <br /> I I I i I CCR 1tqftOF <br /> MLLD MANUFACTURER(S): ---J�p49OF36 <br /> 490-37 <br /> MODEL 490-38 <br /> 0 3.ELECTRONIC LINE LEAK DETECTOR(FLED)- 1:16L]l THAT ROUTINELY PERFORMS 3.0&P d.LEAK TESTS (23 <br /> ELLD MANUFACTURER(S) CCR§2636) <br /> -- z-- - 490.40. t--------------------- <br /> PROGRAMMED IN LINE LEAK TEST: MODEL-- #(S): 490-411" <br /> _____________________________.____.....».___._---------- <br /> 2.MU41MUM ANNUAL 0.1 g.p.h. 490-42 <br /> ELLD DETECTION OF A PIPING LEAK TRIGGERS0 �THLY 0.2 g.p.h. <br /> AUTOMA'T'IC PUMP SHUTDOWN. <br /> ELLD FAILURE/DISCONNECTION TRIGGERSa.YES 0&NO 49043 <br /> 4.PIPE INTEGRITY TESTING 4"45 AUTOMATIC PUMP SHUTDOWN. YES ❑b.NO 49044 <br /> TEST FREQ11UENCLyy r] a.ANNUALLY b.EVERY 3 YEARS nQ r" <br /> 5.VISUAL PIPE---MONITORING. c.OTHER(S eci <br /> ago a6490 47 <br /> FREQUENCY 0 a.DAILY [] b.WEEKLY []c.M'11N.MONTHLY&EACH TIME SYSTEM OPERATED- 41041 <br /> *All"will"i for mQniwri---r­6".A <br /> El 6.SUCTION PIPING MEETS EXE <br /> MPTION CRITERIA 123 CCR S2636-1111i <br /> 490-51 7.NO REGULATED PIPING PER HEALTH AND SAFETY CODE,DIVISION 2u,Rl A ER 0.7 Is CONNECTED TO THE TANK SYSTEM <br /> 410 So <br /> ❑ 99.OTHER(Specify) <br /> 490-5. <br /> 440.53 <br /> UPCF UST-D(12aWl 114 <br />