Laserfiche WebLink
SWRCB,January 2002 <br /> Sage of <br /> S. Sr PIPE TESTING <br /> T_. epipe M ufacer 0 Indus Standard Professional Engineerpy: <br /> 0 Other(Spee) <br /> Testth <br /> od Usegd: Wressure 0 Va <br /> 0 Hydrostatic <br /> 0 Other(Svec ) <br /> Test Equipmenttlse : Pressure gauge/Nitrogen <br /> Equipment Resolution: . 0 s i <br /> j . :.tF«"�15rFd1r MnR,Y9lbaan9..n4y'A.Aw'o-ui'Su0.ke+:P,4m.^,pWMy'ytylh'+if%n:+„AWm1C\S,.wm;GFn"ir✓.i3M111&Y. <br /> Piping MatePiping Run# <br /> rial: FRF FRF <br /> Piping nfa er: AOami t ami th <br /> Piping Diameter: 2'1-311 211-30' <br /> Length of Piping1 0 1 <br /> ` 120 <br /> .Product Stored: Unleaded Fremium <br /> Method and location of Test_,Boot <br /> "°i Test opt <br /> nffi B isolation: inside sump inside sum ; .z <br /> Wait t' e between applying <br /> pressure/vacuum/water and 10min. 70min. <br /> startin test: <br /> .T est-Stan Ti e: 9:25am _ :5 a,m <br /> Initial Reading(RI), 5psi psi <br /> Test zed T' e: 1 :2 a 1 0:5 am <br /> Final Reading(Rp 5s i 5 s i <br /> Test tion: 1 r a 1 hr <br /> Change in Readincy r-Rx)® 0lasi O <br /> Pass/Fail -hreshold or =0. 0 p s i O mps i ps i <br /> Criteria: <br /> Test Result: 5 Pass0 Fail 21 Pass 0 Fail 0 Pass 0 Fail 0 Pass 0 Fail <br /> is�- incl in aratean arr re airs trzade rear to testerz , and recarraeded folla4v-u far aeled tests) <br />