Laserfiche WebLink
SWRCB,January Pagel SWRCB,January 2002 e <br /> Pa.g _of_ <br /> Test Method Developcd TING, TESTING <br /> dustry Standar Professional Engineer g Test 1 Sethod Deroefopcd By: Z Sump Manufacturer C Industry Standard11 2 Professional Engineer <br /> - ar(SP, IOther!Spec fy) <br /> Test Method Used: 5:PrmureTest Method Used: <br /> um. ostatic Pressure z Vacuum 3 Hydrostatic <br /> "Specif <br /> Tes4£qupmeMCsed Pressure gauge gen Equipmem n05opsi leabquipmel INCON TS STS Equipment Resolution:0—.000111-- <br /> : . L- <br /> .............. <br /> 1 Smnp# 2- Sump A S.mpa <br /> .......... <br /> 0 <br /> Sump 9 1-� <br /> 91 <br /> Ptpin�Mazeral: l FRP FRP Pipin Sump Diameter: 2- 42" <br /> k Piping Manufacturer: AO Smith AO Smit <br /> Sump Depth: 60 551, <br /> Sump Material: FRP FRP <br /> j kLelngth ofPiping Run: 130' <br /> dto -Pp 120' Height from Tank Top to Top of 22" 181,Scored: <br /> .:!Run Unleaded Premiu <br /> Hilliest Pi�hPone�talion,. <br /> from Tank Top.Lowest <br /> wfethodandlocatonof Test Boot Test Electrical Penetration: 30" j 32" <br /> piPjag-nu4isolation: inside sump can 1 inside i Condition of sump prior t;testing. <br /> Wait time between applying Clean <br /> Pressme/vacuum/water and 10min. 10min. t orionofSumpTested' 32- i 34" <br /> starting test: u Iturbine shut down when <br /> Test-stan Time: Z Yes CNo ZNA <br /> sensor detects liquid(both <br /> Initial Reading(Rj): I 9.50am ct and water?* 5cYes ZNo ZM C Yes r-No NA u ONA <br /> ,L5psi 5psi <br /> Test End Time: e shutdown response time 5sec. 6sec. <br /> ----1-0:25am 10*50am em programmed for fail-safe 'Yes NA <br /> Yes Z, <br /> Fin Reading(R,): 5 s 5 s fe -No Z '. ,CNA�1 <br /> own?* :Eye- Z­No jNA q Yes C No CNA Z Yes n No C1 MA <br /> Tea Duration- 1hr. 1 h r. :fail-safe verin D be — 2P Yes C—NOC NA <br /> Change in in—R;-�dig(RR,).: Opsi ratiol N Yes Z No 3 NA C YesC No CNA <br /> 11:�,' :: Alaiz time b 1 DYes C-No CNA <br /> Pass/Fail Threshold r--e/v or -.0.0psi ps:i 10min. 10min. <br /> Criteria- pand starting <br /> test: <br /> Test ResResort: 2x Pass C Fail j 2:Pass :3 Fail L Pass — <br /> j a i Test 9:26am 1 02 <br /> Co I * g(Rt): 4.2013 6.1637" <br /> recommended follow uA for ailed tests) ... i Time: 9:41 <br /> 23 am <br /> Reading(R# 4.2013"- ! 6.1639" <br /> est Duration: 15 <br /> Change in R 0.00001, <br /> 0-0002 1; <br /> s./Fail or Crit t0.002" ±0.002" <br /> Test paw 9 Pass C Fail <br /> Pass 2 Fail Z Pass n Fail <br /> 7y <br /> removed for to es 01 3ycs -'No C NA :1 Yes 7,No :1 NA CYes :]No CNA <br /> nwr property repl <br /> NA <br /> v ed functional after t 2tyeS C No N'A Yes --No C NA 2 Yes 21 No 0 INA <br /> ------------------- <br /> COMMQUtS-Include airs made <br /> rior to resrinR,and nded followl failed tests) <br /> MW QW0 mom -.'If the entire depth of the sump is not tested,specify how much fthe answer to an, scions indicated with an <br /> 3 4 asterisk(*)is"NO"or"INA",the entire sump must be tested,(See LO-160) <br /> OCT 1 201 <br /> ENVIRONMENTAI <br /> ;4CW'rU nr-060'ra ql="— <br />