Laserfiche WebLink
JUL-12-2005 09:21 FROM:TRACYTK & AUTO S .2098325307 TrAwar,40138 P.3 <br /> O W <br /> Comments: 4-1,;77 T- <br /> �/L t <br /> /A Id Pt-7-7 A 6 <br /> kj <br /> Items Requiring Follow-Up Actions: <br /> Instructions: <br /> Monthly visual inspection of the UST system in,ist be conducted by a Designated UST Operator,who <br /> possesses a current"California UST System Op=tor"certification issued by the International Code <br /> Council. <br /> A copy of this monthly visual inspection checklia mint be provided to the UST Owner or Operator. <br /> The Designated UST Operator must alert the us r owner or Operator of any condition discovered during <br /> the monthly visual inspection that may require follov"up actions. <br /> The UST Owner or Operator must maintain a copy of this monthly visual inspection checklist and all <br /> attachments for the previous 12 months. The rec orris must be maintained on-site or,if approved by the <br /> local agency,off-site at a readily available location. <br /> Ptge2cf2 September 2004 <br />