My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1998-2006
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
TRACY
>
3940
>
2300 - Underground Storage Tank Program
>
PR0507837
>
COMPLIANCE INFO_1998-2006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/21/2024 4:32:59 PM
Creation date
6/3/2020 9:58:57 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1998-2006
RECORD_ID
PR0507837
PE
2361
FACILITY_ID
FA0008057
FACILITY_NAME
TRACY TRUCK AND AUTO STOP
STREET_NUMBER
3940
Direction
N
STREET_NAME
TRACY
STREET_TYPE
BLVD
City
TRACY
Zip
95304
APN
21220004
CURRENT_STATUS
01
SITE_LOCATION
3940 N TRACY BLVD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0507837_3940 N TRACY_1998-2006.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
504
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TANK ANNULAR TESTING <br />Test:V10400: ay: . Manufacturer p IndustryStandard p Professional En-qr. p Other (see below) <br />`fest Method Uses: p Pressure Vacuum p Hydrostatic O Other (see below) <br />Measuring Equipment Used: Vacuum Gauge (range t) to slu inches Hg) <br />®eScrip#iion Tank #1 Tartk #2 Tank 3W Tank #E <br />Tank Manufacturer <br />Trusco <br />Trusco <br />Trusco <br />Trusco <br />Tank Type <br />Steel <br />Steel <br />Steel <br />Steel <br />Tank Capacity <br />12,000 <br />8,000 <br />20,000 <br />20,000 <br />Product Stored <br />Gasoline - 87 <br />Gasoline - 91 <br />Diesel <br />Diesel <br />Is this a multi -compartment tank? <br />Yes <br />Yes <br />No <br />No <br />Brine filled or Dry Annular'? <br />Dry <br />N/A <br />Dry <br />Dry <br />(if brine filled, perform no vacuum testing) <br />Monitoring system show normal annular? <br />Yes <br />N/A <br />Yes <br />Yes <br />Is water table above tank bottom? <br />Unknown <br />N/A <br />Unknown <br />Unknown <br />Was sensor removed for testing? <br />Yes <br />N/A <br />Yes <br />Yes <br />Was sensor properly replaced after testing? <br />Yes <br />N/A <br />Yes <br />Yes <br />Wait time for vacuum to stabilize (hr:min) <br />0:20 <br />0:16 <br />0:12 <br />Test start time <br />8:30 AM <br />8:31 AM <br />8:32 AM <br />Initial vacuum (inches Hg) <br />7 <br />7 <br />7 <br />Test end time <br />10:30 AM <br />10:31 AM <br />10:32 AM <br />Final vacuum (inches Hg) <br />7 <br />7 <br />7 <br />Test duration (hours:minutes) <br />2:00 <br />2:00 <br />2:00 <br />Change in vacuum (inches Hg) <br />0 <br />0 <br />0 <br />Pass/Fail threshold (inches Hg/hour) <br />2 <br />2 <br />2 <br />TEST RESULT <br />PASS <br />PASS <br />PASS <br />Comments: <br />Tank #2 is the second compartment of a two compartment <br />tank <br />(1 / #2). <br />No annular testing required. <br />Tank #3W is the West diesel tank and tank #4E is the East diesel tank. <br />0 2002 Walton Engineering, Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.