Laserfiche WebLink
Sonitoring System Certification <br />Site Address: 3940 KTRACY BLVD <br />Complete the following checklist: <br />E] Check this box if tank gauging is used only for inventory control. <br />0 Check this box it no tank gauging or SIR equipment is installed. <br />Yes <br />[]No • <br />Has all input wiring been inspected for proper entry and termination, including testing for ground Wits? <br />Yes <br />[:] No • <br />Were all tank gauging probes visually inspected for damage and residue buildup? <br />M Yes <br />1-1 No • <br />Was accuracy of system product level readings tested? <br />(Eyes <br />0 No. <br />Was accuracy of system water level readings tested? <br />Yes <br />No • <br />Were all probas reinstalled properly? <br />Yes <br />1:1 No * <br />Were all items an the equipment manulacturers° maintenance checklist completed? <br />- in ine beeztn n. <br />G. Line Leak Detectors (LLD): Check this box if LLDs are not installed <br />=r-TUMM, IMM =,=M <br />- in me :jeciion m, oeiow, oescrioe now aria wnen mese aenctericies were or win oe correcEea, <br />H. Comments: <br />water in bofth diesel stp sumps <br />page 3 of 3 <br />For equipment start-up or annual equipment certification, was a leak simulated to verity LLD performance? <br />(Check all that apply) Simulated leak rate: 3 g.p.h 0.1 g.p.h [—]0.2 g.p.h <br />For mechanical LLDs, does the LLD restrict product flow if it detects a leak? <br />--s—, <br />LLD d—Ge—s—the turbine automatically shut off it the LLD detects a leak? <br />For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system malfunctions or fails a test? <br />For electronic LLDs, have all accessible wiring connections been visually inspected? <br />Were all items on the equipment manufacturersi maintenance checklist completed? <br />- in me :jeciion m, oeiow, oescrioe now aria wnen mese aenctericies were or win oe correcEea, <br />H. Comments: <br />water in bofth diesel stp sumps <br />page 3 of 3 <br />