Laserfiche WebLink
19'. Piping (cross-sectional diagram, including connections to tank and dispensers). <br />(A) vent and tank riser primary containment system equipped with overfill prevention system that: <br />_ Restricts delivery of flow to tank CSection 2635 (b) (2) (8) or (C)], or <br />_✓ Provide positive shut off of flow to the tank at no more than 95 % CSection 2635 (b)(2)(C)3, or <br />(g) vapor recovery piping designed so it cannot contain liquid phase product, or <br />(C) IV Suction piping (below grade piping operates at less than atmospheric pressure) (Section 2636 (a) (3)] <br />Sloped so contents of the pipe will drain back into the storage tank if the suction is - <br />released. <br />No valves or pumps installed below"grade. <br />Inspection method provided to demonstrate compliance with section 2636 (a) (3). <br />(D) Corrodible underground piping protected against corrosion (Section 2636 (b)). <br />(E) Underground primary piping will meet all of the following requirements <br />_✓ Primary piping in contact with hazardous substance under normal ap�fation conditions shall be: <br />installed inside a secondary containment system in the form of: ✓✓ secondary pipe_Vault or <br />_lined trench to be sloped to a collection sump at the low point of the piping. <br />✓ Primary piping and secondary containment systems will be installed in accordance with industry <br />code of practice and voluntary consensus standards.. <br />1J. A, Lined trench used as secondary containment <br />Material compatible with the substance stored. <br />Covered and capable of supporting any expected vehicular traffic. <br />(f) Underground piping with secondary containment will be equipped and monitored as follows: <br />✓ Secondary containment will be equipped with a continuous monitoring system connected to an audible <br />and visual alarm system. <br />_ Automatic line leak detectors will be installed on pressurized piping <br />Manufacturer: Model: <br />_ Annual monitoring will be conducted on the pressurized piping with secondary containment. <br />_✓ Annual line tightness test will not be required if the continuous monitor shuts down the pump and <br />activates the alarm system when a release is detected and when the continuous monitoring system <br />fails or is disconnected. <br />20. State Water Resources Control Board "Facility (A)" and "Tank Permit (B)" application forms submitted. <br />21. Plan review and operating permit fees paid. <br />22. What is the approximate depth to ground water: 10 F <br />(include source of information - borehole logs, monitoring well data, water <br />studies, etc.) 5. T c0owr (r�LoJv�bwl�Tt� Q.£Q0+2Z j�RS (Z=eP:1� I1 <br />23. Total number of tanks an site after installation: <br />24. N/ County/City Fire District and Building Department notified. <br />25. In the event contamination is observed, confirmed or suspected as a result of a leaking UST system it is your <br />responsibility (in accordance with (CCR) Title 23, Division 3, Chapter 16, Article 11, Corrective Action <br />Requirements] as an owner or operator to submit a workplan to PHS-EHD Site Mitigation unit prior to initiating any <br />assessment or remediation activities. For further assistance contact the Site Mitigation Unit at (209) 469-3450. <br />The owner ator t acknowledge this responsibility for workplan submittal by signature and date below. <br />s <br />Name '�, Title UV14"ZEP--- Date 2-11:2 G <br />CONDITIONS OF APPROVAL: - <br />0 <br />