Laserfiche WebLink
... . ,. r.. �: • r Mircesux-MossamiR <br />r <br />a. New facility plan review fee of 5624.00 (8 hour minimum per facility), $170.00 fee per <br />tank, plus 556.00 state surcharge fee per tank is due at time of plan submittal. <br />b. New installation of an additional tank at an existing facility is $624.00 plan review fee (8 <br />hour minimum per facility) plus $170.00 fee per new tank, and $56.00 per tank state <br />surcharge fee. <br />C. It should be noted that a 5624.00 plan review check fee required for each submittal allows <br />for up co eight (8) hours of staff review and/or inspection time. Additional time spent on <br />plan review, meetings, inspections, phone or office consultations will be billed co the <br />applicant at a rate of 578.00 per hour. <br />d. The maximum review time for UST installation plans is 40 working days. A preliminary <br />review will be conducted by the PHS-EHD within 20 working days of submittal date to <br />identify any gross plan deficiencies. <br />e. If gross deficiencies are identified, the plans will be returned with a checklist identifying plan <br />deficiencies. <br />f. To expedite the review of installation plans, time and a half per hour overtime fee may be <br />submirr-ed to have review completed within 10 working days of submittal date if staff is <br />available to perform the review. <br />3. PLAIN REVIEW GU DELLy'ES <br />a. The enclosed plan review sheet is to be completed and submitted with the three sets of <br />drawings to PHS -FOD. <br />b. A copy of the California UST Regulations may be obtained from the California State Water <br />Resources Control Board at (916) 227-4303. <br />C. its and/or plan check approval may also be required by the San Joaquin Valley Unified <br />4 Pollution�ont • District, • • tBuildingi •. m nE and the Fire District in <br />your r area. <br />A minimum of 3 inspections will be conducted on the UST system installation. A $78 per <br />hour inspection fee shall be charged for additional inspections or remspection as required. <br />required inspections • a, <br />e. Applicant/contractor to adhere to the approval plan and any change or deviation shall be <br />reported to and approved by PHS-EHD prior to installation. <br />f. The application for installation of underground tanks is only valid for the calendar year in <br />which it has been issued. A permit may be extended into the next calendar year if a letter is <br />sent to PHS-EHD requesting this extension thirty days prior w the end of the calendar year. <br />A one time, one year extension may be granted by PHS-EHD upon receipt of this letter. <br />iM <br />