Laserfiche WebLink
UST SYSTEM ORANING INFORMATION <br />1 Three coa,ptete sets of planes (inctude mamfacturer's specification sheets for proposed equipment to be installed; <br />2, ✓ Plans drawn to scale in non -erasable print. <br />3_ ✓ Ploc plan -a show location of tanks and alt associated piping. <br />4, _V-1, Striker places or drop tube -mounted bottom protectors illustrated below alt accessible openings. <br />5_ ✓ Tank cross -sectional -diagram. <br />6, _✓ oecaiL of tank, associated piping, excavation and cover. <br />T, _✓ Tank(s) and piping approved by a nationally recognized independent testing organization_ Witte 23, Chapter 16, <br />Articte 3, Section 2631 (b) & 26351 <br />3, _I/ verification of product compatibility with the tankts), piping, monitoring <br />device(s), epoxy or silicone glues, etc. <br />q, Manufacturer's written installation instructions for cank(s), piping, monitoring devices, etc. <br />10. '/ At the installation site, prior to installation, a tightness test shaft be performed on both primary (1°) and <br />secondary (2°) containment systems before covering. (Section 2635 (a) (3) & (4)3 <br />11. ✓ Tank integrity test required upon completion of installation with tank in operating condition. Test results to <br />submitted directly to PHS-eHO from the testing or owner of facility. (Health & Safety Cade, Oivision 2C <br />Chapter 6.7, Section 25241 (h)3 <br />6. <br />TAMC .. <br />$ <br />x, <br />S 2 <br />e <br />CAPACITY I /u &ALLc NS <br />i%p <br />i� <br />` j? <br />MANUFACTURER <br />TizV SGo <br />CCMPOS I T I ON <br />MODEL '15V <br />gear,"Ir- <br />PRCOUCT <br />I s �. <br />i o► L <br />I v I: <br />CCRRCSICN PROTECT ICN <br />U.L. LISTED( <br />7 J E j <br />CCMPA T I S I L I TY WITH 100". <br />METHANOL <br />j <br />13. TANK(s) TO 3E INSTALLED <br />A. steet-ctad with fiberglass reinforced plastic coatings, composites, or equivalent non-metaitic exterior <br />coatings or coverings. <br />(1) Tested at the instatlation site using an electric resistance holiday detector. <br />Z(2) vacuum appLied to interstitiat space. <br />3. <br />C. <br />Fiberglass <br />(1) tnstattation instruction require an air test and soap bubble test prior to instaltatior <br />(2) vacuum applied to interstitial space. <br />(3) Hydrostatic annular Cprimery tank pressure test). <br />Non-ctad steet tank (Section 2635 (a) C2) CAll - <br />(1) Cathodic protection provided for entire tank, piping and components (rests, bolts, washer - <br />etc.). <br />C2) Fietd installed cathodic protection system designed and certified as adequate by a <br />corrosion specialist. <br />(3) Impressed current systems to be inspected no Less than every 60 days_ <br />5 <br />