Laserfiche WebLink
►r r <br />* ALL TRUSCO SUPERTANKSn SHALL BE INSTALLED USING AN APPROVED, <br />INERT BEDDING AND BACKFILL MATERIAL AS SPECIFIED BELOW. <br />SAND: CLEAN AND FREE OF DEBRIS <br />GRAVEL: 3/4" OR SMALLER ROUNDED AGGREGATE OR PEA GRAVEL <br />* THE EXCAVATION BASE SHALL BE COVERED WITH A MINIMUM OF 12" <br />APPROVED BEDDING MATERIALS. <br />* <br />WARNING: PLACEMENT OF A TANK DIRECTLY ON A HOLD DOWN PAD, ON A <br />PAD SMALLER THAN THE TOTAL TANK AREA, OR ON INTERMEDIATE <br />SUPPORTS (SADDLES) WILL CAUSE UNEVEN DISTRIBUTION OF LOADS. <br />THIS MAY CONTRIBUTE TO STRUCTURAL FAILURE, AND IS NEVER <br />PERMITTED. <br />* THE BACKFILL SHALL BE UNIFORMLY THE SAME AS THE BEDDING <br />MATERIALS AND SHALL BE PLACED ALONG THE BOTTOM AND SIDES OF THE <br />TANK IN SUCH A MANNER AS TO ENSURE THE TANK IS FULLY AND EVENLY <br />SUPPORTED. <br />* WARNING: DO NOT STRIKE THE F.R.P. SECONDARY CONTAINMENT WITH <br />SHOVELS, TAMPING TOOLS, OR EQUIPMENT! <br />4. CONTRACTOR REVIEW OF TANK DELIVERY DOCUMENTATION: <br />* THE TRUSCO TANK DELIVERY DRIVER SHALL -SUBMIT THE FOLLOWING <br />DOCUMENTATION TO THE CONTRACTOR UPON ARRIVAL AT THE TANK <br />INSTALLATION JOB SITE: <br />INSTALLATION INSTRUCTIONS <br />INSTALLATION CHECKLIST (ONE PER TANK) <br />CALIBRATION GAGE CHART (ONE PER TANK SIZE) <br />SPECIFICATION SHEET (ONE PER TANK) <br />PRESSURE TEST INSTRUCTIONS (WHEN APPLICABLE) <br />* THE CONTRACTOR SHALL COMPARE THE SPECIFICATION SHEET WITH THE <br />ACTUAL TANK TO VERIFY: TANK CAPACITY, UL NUMBER, AND NOZZLE AND <br />APPURTENANCES CONFIGURATION. <br />* THE CONTRACTOR SHALL RECORD THE ACTUAL VACUUM LEVEL. SEE <br />QUESTION #1 ON THE INSTALLATION CHECK LIST. <br />* THE CONTRACTOR SHALL SUBMIT THE CALIBRATION GAGE CHART TO THE <br />TANK OWNER. <br />* THE CONTRACTOR SHALL COMPLETE THE INSTALLATION CHECKLIST AND <br />MAIL BACK TO TRUSCO TANK. TRUSCO TANK WILL MAIL THE WARRANTY <br />DIRECTLY TO THE TANK OWNER. <br />3 rev. 7/13/90 <br />