My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1998-2006
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
TRACY
>
3940
>
2300 - Underground Storage Tank Program
>
PR0507837
>
COMPLIANCE INFO_1998-2006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/21/2024 4:32:59 PM
Creation date
6/3/2020 9:58:57 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1998-2006
RECORD_ID
PR0507837
PE
2361
FACILITY_ID
FA0008057
FACILITY_NAME
TRACY TRUCK AND AUTO STOP
STREET_NUMBER
3940
Direction
N
STREET_NAME
TRACY
STREET_TYPE
BLVD
City
TRACY
Zip
95304
APN
21220004
CURRENT_STATUS
01
SITE_LOCATION
3940 N TRACY BLVD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0507837_3940 N TRACY_1998-2006.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
504
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
►r r <br />* ALL TRUSCO SUPERTANKSn SHALL BE INSTALLED USING AN APPROVED, <br />INERT BEDDING AND BACKFILL MATERIAL AS SPECIFIED BELOW. <br />SAND: CLEAN AND FREE OF DEBRIS <br />GRAVEL: 3/4" OR SMALLER ROUNDED AGGREGATE OR PEA GRAVEL <br />* THE EXCAVATION BASE SHALL BE COVERED WITH A MINIMUM OF 12" <br />APPROVED BEDDING MATERIALS. <br />* <br />WARNING: PLACEMENT OF A TANK DIRECTLY ON A HOLD DOWN PAD, ON A <br />PAD SMALLER THAN THE TOTAL TANK AREA, OR ON INTERMEDIATE <br />SUPPORTS (SADDLES) WILL CAUSE UNEVEN DISTRIBUTION OF LOADS. <br />THIS MAY CONTRIBUTE TO STRUCTURAL FAILURE, AND IS NEVER <br />PERMITTED. <br />* THE BACKFILL SHALL BE UNIFORMLY THE SAME AS THE BEDDING <br />MATERIALS AND SHALL BE PLACED ALONG THE BOTTOM AND SIDES OF THE <br />TANK IN SUCH A MANNER AS TO ENSURE THE TANK IS FULLY AND EVENLY <br />SUPPORTED. <br />* WARNING: DO NOT STRIKE THE F.R.P. SECONDARY CONTAINMENT WITH <br />SHOVELS, TAMPING TOOLS, OR EQUIPMENT! <br />4. CONTRACTOR REVIEW OF TANK DELIVERY DOCUMENTATION: <br />* THE TRUSCO TANK DELIVERY DRIVER SHALL -SUBMIT THE FOLLOWING <br />DOCUMENTATION TO THE CONTRACTOR UPON ARRIVAL AT THE TANK <br />INSTALLATION JOB SITE: <br />INSTALLATION INSTRUCTIONS <br />INSTALLATION CHECKLIST (ONE PER TANK) <br />CALIBRATION GAGE CHART (ONE PER TANK SIZE) <br />SPECIFICATION SHEET (ONE PER TANK) <br />PRESSURE TEST INSTRUCTIONS (WHEN APPLICABLE) <br />* THE CONTRACTOR SHALL COMPARE THE SPECIFICATION SHEET WITH THE <br />ACTUAL TANK TO VERIFY: TANK CAPACITY, UL NUMBER, AND NOZZLE AND <br />APPURTENANCES CONFIGURATION. <br />* THE CONTRACTOR SHALL RECORD THE ACTUAL VACUUM LEVEL. SEE <br />QUESTION #1 ON THE INSTALLATION CHECK LIST. <br />* THE CONTRACTOR SHALL SUBMIT THE CALIBRATION GAGE CHART TO THE <br />TANK OWNER. <br />* THE CONTRACTOR SHALL COMPLETE THE INSTALLATION CHECKLIST AND <br />MAIL BACK TO TRUSCO TANK. TRUSCO TANK WILL MAIL THE WARRANTY <br />DIRECTLY TO THE TANK OWNER. <br />3 rev. 7/13/90 <br />
The URL can be used to link to this page
Your browser does not support the video tag.