Laserfiche WebLink
a <br />TNS 71.,4 Z. L A 7--r Ar CH..L7 T.S7 W <br />BEFORE INITIATING THE INSTALLATION OF A TRUSCO SUPERTANK ", READ AND <br />UNDERSTAND THE INSTALLATION INSTRUCTIONS THOROUGHLY. AS THE <br />INSTALLATION PROGRESSES, INITIAL EACH TASK AS IT IS PERFORMED. FAILURE <br />TO COMPLETE THIS CHECKLIST DURING INSTALLATION AND FAILURE TO RETURN THE <br />COMPLETED CHECKLIST WITHIN 10 DAYS AFTER TANK INSTALLATION SHALL PREVENT <br />ISSUANCE OF THE TRUSCO SUPERTANK " WARRANTY. TRUSCO REPRESENTATIVES ARE <br />AVAILABLE TO ASSIST WITH ANY QUESTIONS THAT MAY ARISE DURING <br />INSTALLATION. PLEASE DO NOT HESITATE CONTACTING THEM. <br />THE FOLLOWING INFORMATION IS TO BE COMPLETED BY THE INSTALLATION <br />CONTRACTOR AND SIGNED BY BOTH THE OWNER, OR THE OWNER S REPRESENTATIVE, <br />AND THE INSTALLATION CONTRACTOR. <br />- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - <br />DELIVERY DATE <br />U.L.• <br />TANK OWNER: INSTALLATION DATES] AND BALLY c. <br />NAME = <br />ADDRESS - INSTALLATION ADDRESS: <br />CITY ZIP NAME <br />CONTACT ADDRESS <br />PHONE NO. CITY ZIP <br />INSTALLATION CONTRACTOR: <br />NAME <br />ADDRESS <br />CITY ZIP <br />CONTACT <br />PHONE NO. <br />SIGNATURES: <br />CONTRACTOR <br />DATE <br />OWNER OR OWNER'S REPRESENTATIVE <br />FiEVO <br />VERIFIED BY: <br />1. ACTUAL VACUUM LEVEL UPON DELIVERY: <br />IF VACUUM LEVEL IS LESS THAN 7", <br />SEE VACUUM TROUBLE SHOOTING INSTRUCTIONS. <br />2. WAS HANDLING PERFORMED IN ACCORDANCE WITH SECTION 5? <br />YES NO <br />3. WAS THE TANK OFF—LOADED INTO THE EXCAVATION. <br />YES NO <br />OR W'%S THE TANK STORED PER SECTION 5? YES NO <br />page 1 of 2 revised 2/8/90 <br />