My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2007-2009
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
TRACY
>
3940
>
2300 - Underground Storage Tank Program
>
PR0507837
>
COMPLIANCE INFO_2007-2009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/21/2024 4:41:40 PM
Creation date
6/3/2020 9:59:00 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2007-2009
RECORD_ID
PR0507837
PE
2361
FACILITY_ID
FA0008057
FACILITY_NAME
TRACY TRUCK AND AUTO STOP
STREET_NUMBER
3940
Direction
N
STREET_NAME
TRACY
STREET_TYPE
BLVD
City
TRACY
Zip
95304
APN
21220004
CURRENT_STATUS
01
SITE_LOCATION
3940 N TRACY BLVD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0507837_3940 N TRACY_2007-2009.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
406
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
17 February 2009 <br /> AGE-NC Project No. 04-1173 <br /> Page 3 of 4 <br /> • Benzene, toluene, ethyl benzene and xylenes by EPA Method 8020. <br /> Laboratory reports for ground water analyses,testing methods,laboratory quality assurance/quality <br /> control reports, and sample chain of custody documentation will be included with the laboratory <br /> report. <br /> EMERGENCY PROCEDURES <br /> In the event that a fuel product line is inadvertently damage and a fuel release occurs,the emergency <br /> shut-off switch for the dispenser islands will be placed in the off position. All work will stop, <br /> appropriate emergency responders will be notified, the area cordoned-off with caution tap and <br /> delineators. SJCEHD will also be notified. <br /> EQUIPMENT DECONTAMINATION <br /> Prior to use,all sampling tools used for sample collection will be thoroughly rinsed with clean water <br /> after being washed with a solution of Alconox. All probing rods will be cleaned prior to <br /> advancement at each sample location. <br /> BORING ABANDONMENT <br /> The soil boring borehole will be allowed to backfill with gravel. <br /> REPORT PREPARATION <br /> Upon completion of field work and receipt of final laboratory analysis, a report will be prepared <br /> presenting the findings of the sampling.The report will include a description of the work performed <br /> and results of the sampling and analysis. Conclusions,applicable recommendations, and maps will <br /> be included in the report. <br /> Advanced GeoEnvironmental,Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.