Laserfiche WebLink
07/30/2008 WED 15-.42 FAX 2094683433 SJC EHD 0018/030 <br /> Be sure to always READ THE DRAWINGS or plans <br /> to make sure that your mounting points are the <br /> same. Call Bravo Systems if any problem occurs. <br /> A2 - Position and bolt down conversion frame to the dispenser pan using the <br /> anchor plates of the conversion frame with minimum 1/2" Diameter bolts. Use plastic <br /> caps to cover the bolts/nuts. <br /> For Non-Bravo Sumps - A minimum of Four anchor bolts must be secured directly to concrete. <br /> A3 - Adjust electrical conduits to line up with the new dispenser if necessary. <br /> A4 - Pre-plumb all product inlets and vapor recovery line with offsets andior rigid <br /> pipe and elbows if necessary. <br /> DEPENDING ON NEW DISPENSER USED AND/OR <br /> OFFSET APPLICATION, THE RISER ON THE DISPENSER MAY <br /> NEED TO BE SHORTENED TO ACCOMMODATE THE SPACE <br /> TAKEN UP BY THE USE OF OFFSETS, ELBOWS, ETC... <br /> A5 - Position and bolt down the dispenser to the conversion frame with the anchor <br /> bolts provided. <br /> NEW DISPENSER BASE <br /> /Aft,1E S <br /> BMvO <br /> CONVERSION FRAME OFFSET <br /> SRAVO <br /> m <br /> Conversion Anchor Bolt OFFSET <br /> Anchor Plate <br /> BRAVO BOX <br /> Concrete Anchor BoltI d- i FOR OLD <br /> DISPENSER <br /> 2 ii-ConversionFrame 1-14-08 <br />