Laserfiche WebLink
Page 10 of 14 <br /> 14. UNDER-DISPENSER CONTAINMENT UDC TESTING <br /> Test Method Developed By: ❑UDC Manufacturer I] Industry Standard ❑Professional Engineer <br /> ❑Other(Specify) <br /> Test Method Used: ❑Pressure ❑Vacuum El Hydrostatic <br /> ❑ Other(Specify) <br /> Test Equipment Used: Lake Test Equipment Resolution: <br /> UDC# 13-14a UDC # 14-15a UDC # 15-16a UDC# 16-17a <br /> UDC Manufacturer: Bravo Bravo Bravo Bravo <br /> UDC Material: Steel Steel Steel Steel <br /> UDC Depth: <br /> Height from UDC Bottom to Top of 0 0 0 0 <br /> Highest Piping Penetration: <br /> Height from UDC Bottom to Lowest 0 0 0 0 <br /> Electrical Penetration: <br /> Condition of UDC prior to testing: Dry Dry Dry Dry <br /> Portion of UDC Tested' 2" above product 2" above product 2" above product 2" above product <br /> Does turbine shut down when UDC <br /> sensor detects liquid(both product ❑ Yes ❑ No IRI NA ❑ Yes ❑ No ® NA ❑Yes ❑ No ® NA ❑Yes ❑ No IM NA <br /> and water)?* <br /> Turbine shutdown response time See comment <br /> Is system programmed for fail-safe ❑ Yes ❑ No ® NA ❑Yes ❑ No ❑ NA ❑Yes ❑ No ❑ NA ❑Yes ❑ No ❑ NA <br /> shutdown?' <br /> Was fail-safe verified to be ❑ Yes ❑ No IRI NA ❑Yes ❑ No ❑ NA ❑Yes ❑ No ❑ NA ❑Yes ❑ No ❑ NA <br /> operational?* <br /> Wait time between applying <br /> pressure/vacuum/water and starting 5 min 5 min 5 min 5 min <br /> test <br /> Test Start Time: 4:00 PM 4:00 PM 4:00 PM 4:00 PM <br /> Initial Reading(Ri): 7 1/2" 7" 7" 73/8- <br /> Test <br /> 3/8"Test End Time: 5:00 PM 5:00 PM 5:00 PM 5:00 PM <br /> Final Reading(RF): 7 1/2" 7" 7" 7 3/8" <br /> Test Duration: 1 hr 1 hr 1 hr 1 hr <br /> Change in Reading(RF-Ri): 0 0 0 0 <br /> Pass/Fail Threshold or Criteria: 1/16 hr 1/16 hr 1/16 hr 1/16 hr <br /> Test Result: 0 Pass ❑ Fain ® Pass ❑ Fail ® Pass ❑ Fail rx1 Pass ❑ Fail <br /> Was sensor removed for testing? ❑ Yes ❑ No IXI NA ❑ Yes ❑ No ® NA ❑Yes ❑ No ® NA ❑ Yes 0 No IRI NA <br /> Was sensor properly replaced after ❑ Yes ❑ No ® NA ❑ Yes ❑ No ® NA ❑Yes ❑ No ® NA ❑ Yes ❑ No ® NA <br /> testing? <br /> Comments—(include information on repairs made prior to testing,and recommended follow-up for failed tests) <br /> Turbine shut down during Annual monitor certification. <br /> ' If the entire depth of the UDC is not tested,specify how much was tested. If the answer to any of the questions indicated with an <br /> asterisk(*)is"NO"or"NA",the entire UDC must be tested. (See SWRCB LG-160) <br />