Laserfiche WebLink
MAR-13-2008 11:57A FROM: TO:4683433 P.3 <br /> UNIFIED PROGRAM CONSOLIDATED FORM <br /> UNDERGROUND STORAGE TANK <br /> MONITORING PLAN (Page 2 of 2) <br /> VI.UNDER DISPENSER CONTAINMENT(UDC)MONITORING <br /> 490-540- <br /> 1. UDC MONITORING IS PERFORMED USING THE FOLLOWING METHOD 490-54b <br /> ❑ 1.CONTINUOUS ELECTRONIC MONITORING 012.FLOAT AND CHAIN ASSEMBLY ❑ 3-ELECTRONIC STAND-ALONE <br /> ❑4.NO DISPENSERS ❑99.OTHER(Specify}: <br /> PANEL MANUFACTURER: 490-11 MODEL : 490-56. <br /> LEAK SENSOR MANUFACTURER: 490:1_7 MODEL#(S): 490-58 <br /> DETECTION OF A LEAK INTO THE UDC TRIGGERS AUDIBLE AND VISUAL ALARMS ❑ a.YES ❑b.NO 490.59 <br /> UDC LEAK ALARM TRIGGERS AUTOMATIC PUMP SHUTDOWN ❑ a.YES ❑b.NO 490'60 <br /> FAILURE/DISCONNECTION OF UDC MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑ a.YES ❑b.NO 490-61 <br /> UDC MONITORING STOPS THE FLOW OF PRODUCT AT THE DISPENSER ❑ a.YES ❑b.NO 490.62 <br /> 2.UDC CONSTRUCTION IS C91.SINGLE-WALLED ❑2.DOUBLE-WALLED 490.63 <br /> IF DOUBLE WALLED: 490.64a <br /> UDC INTERSTITIAL SPACE IS MONITORED BY: ❑1.LIQUID ❑2.PRESSURE [13.VACUUM <br /> A LEAK WITHIN THE SECONDARY CONTAINMENT OF THE UDC TRIGGERS AUDIBLE AND VISUAL ALARMS ❑a.YES ❑b.NO 49O'60.b <br /> VII.PERIODIC SYSTEM TESTING <br /> 1, ELD TESTING: THIS FACILITY HAS BEEN NOTIFIED BY THE STATE WATER RESOURCES CONTROL BOARD THAT ENHANCED 499.65. <br /> LEAK D ECT10 ELD MUST BE PERFORMED. PERIODIC ELD IS PERFORMED EVERY 36 MONTHS AS RgQUIRED. 23 CCR 2644.1 <br /> 1R2.SECONDARY CONTAINMENT COMPONENTS ARE TESTED EVERY 36 MONTHS. 49"6 <br /> U{3.SPILL BUCKETS ARE TESTED ANNUALLY. 499.67 <br /> VIII.RECORDKEEPING <br /> The following monitoring/maintenance records are kept for this facility: <br /> Alarm logs 490.660- aff Visual Inspection Records 490.68b ❑Tank integrity testing results 490.6sc <br /> SIR testing results(and supporting documentation records). 49048d ❑ Tank gauging results(and supporting documentation records). 490-6se <br /> ATG Testing results(and supporting documentation records).ago-68f ❑ Corrosion Protection 60-day logs 490-6sg <br /> RQ tsquipment maintenance and calibration records. 49o.68h <br /> IX.TRAINING <br /> Personnel with UST monitoring responsibilities are familiar with all of the following documents relevant to their job duties. 490.690- <br /> REFERENCE DOCUMENTS MAINTAINED AT FACILITY(Check all that apply) <br /> ja THIS UNDERGROUND STORAGE TANK MONITORING PLAN(Required)490.69b <br /> ® OPERATING MANUALS FOR ELECTRONIC MONITORING EQUIPMENT(Required)490.690 <br /> CK CALIFORNIA UNDERGROUND STORAGE TANK REGULATIONS 490.69d <br /> ❑ CALIFORNIA UNDERGROUND STORAGE TANK LAW 490.69* <br /> ❑ STATE WATER RESOURCES CONTROL BOARD (SWRCB) PUBLICATION: "HANDBOOK FOR TANK OWNERS - MANUAL AND <br /> STATISTICAL INVENTORY RECONCILIATION"490.69f <br /> ❑ SWRCB PUBLICATION:"UNDERSTANDING AUTOMATIC TANK GAUGING SYSTEMS"ago-698 <br /> ❑ OTHER(Specify),M6%.M69i <br /> 19 This facility has a"Designated UST Operator"who has passed the California UST System Operator Exam administered by the International Code Council(ICC). <br /> The"Designated UST Operator"will train facility employees in the proper operation and maintenance of the UST systems annually,and within 30 days of hire.This <br /> training will include,but is not limited to,the following-. <br /> D Operation of the UST systems in a manner consistent with the facility's best management practices <br /> The facility employee's role with regard to the monitoring equipment as specified in this UST Monitoring Plan <br /> The facility employee's role with regard to spills and overfills as specified in the UST Response Pian <br /> Names of contact person(s)for emergencies and monitoring alarms.490-70 <br /> X. COMMENTS/ADDITIONAL INFORMATION <br /> Provide additional comments here r indicate how manFps ithadditional informatic"^"a"nniA,monitoring pr ores are attached to this plan.490-71 <br /> XI.PERSONNEL RESPONSIBILITIES <br /> The UST Owner/Operator is responsible for ensuring that: 1)the daily/routine UST monitoring activities and maintenance of UST leak detection equipment covered by <br /> this plan occurs,2)all conditions that indicate a possible release are investigated,and 3)all monitoring records are maintained properly. <br /> The followson(Jame rrs onsisible for performing the monitoring and equipment maintenance: <br /> NAME 490-72 TITLE 490-73 <br /> NAME �j�j' 10, 490-74 TITLE 490-75 <br /> The Designated Operator shall perform a monthly visual inspection of the facility,provide a report to Am owner/open r,and inform the owner/operator of any <br /> conditions that need follow-up action. <br /> XII.OWNER/OPERATOR SIGNATURE <br /> CERTIFICATION:I certify that the information Rrovided herein is true and accurate to the best of my knowledge. <br /> SIGNATURE 49o-76 DATE: 0-900-7 <br /> L. 3 ' 13 +20 0 $ <br /> RFPR&SEN[7NG❑t T{glj Ovmff(jlQyraror 2 Faed ReoresenfafiveofQwner <br /> APPLICANT NAME(print): 4 78 APPLICANT TI 490 <br /> to r Q- e,1LcTLA <br /> I1PCF <br />