Laserfiche WebLink
MRR 10 2000 1:17PM HP LASERJET 3200 p,2 <br />0 41 <br />W 10 ®m 111 8700 E. Lang Mesa Drive, Prescott Valley, Arizona 86314,1-800-367-0185 <br />u <br />Performance,� -%7;;AF L. 0 0 <br />Highest <br />Most Requested Mechanical Line Leak Detector BuiltToday! <br />Alcohols, Blodiesel, Aviation,. •Diesel <br />• Any Pump* <br />• Electronic , Available. <br />• Longest <br />;_ Length Pipeline <br />_ System* <br />Largest• Volume Pipeline System* <br />• Integrated CheckValve <br />Pressure <br />Relief <br />• Field Adjustable Threshold <br />• Now •Factory• for • <br />llation <br />/ Annual -- ! <br />1K� <br />The 99 111' is the most requested mechanical line leakdetector built today.ik <br />engine_ • • •; •, 111 more <br />attractive to station operators ••. than ever before. Not only 99 LD -2000 less <br />expensive to own, it is faster and less subject to field and line variables. ever before! <br />integrated In -Line Check Valve / Pressure relief <br />Aleaking check valve in the turbine, defective submersible pump pressure relief, or a defective <br />bypass valve will allow the line system to depressurize, resetting the leak detector. Drain - <br />back into the tank and thermal contraction will cause vapor pockets to form. Vapor pockets <br />increase the length of time it takes for a leak detector to open to full flow. Pump problems <br />surch as these result in slow flow and technical support calls. The resulting service costs and <br />customer dissatisfaction all take away from the bottom line - making money. <br />The 99 LD -2000 Is The Only 2" Mechanical Line Leak Detector <br />Capable Of Holding Line Pressure After The Pump Is Off, <br />Even With Pump ComponentFailure. <br />*See Technical Specifications on last page. <br />**Contact factory for details <br />MEMBER <br />. <br />U.S. Patent No. -4,966,190 <br />