Laserfiche WebLink
San Joaquin County <br /> Environmental Health Department DIRECTOR <br /> =— " Donna Heran, REHS <br /> Z ,. 600 East Main Street <br /> Stockton, California 95202-3029 PROGRAM COORDINATORS <br /> Robert McClellon,REHS <br /> Jeff Carruesco,REHS, RDI <br /> Cq�� o.R�i�P Website: www.sjgov.org/ehd Kasey Foley, REHS <br /> Phone: (209)468-3420 <br /> July 9, 2010 Fax: (209)464-0138 <br /> Wl <br /> Melissa Brueckner FRE tij <br /> capy <br /> A.P.E.C. <br /> P.O. Box 55105 <br /> Stockton, CA 95205 <br /> Re: Tracy Truck& Auto Stop SR0060197 <br /> 3940 N. Tracy Blvd., Tracy <br /> The San Joaquin County Environmental Health Department(EHD) has completed the review of <br /> the application for a permit to install intrinsically safe wiring to the L16 diesel east annular <br /> sensor on the underground storage tank(UST) system at the above noted address. The permit <br /> has been approved with the following conditions: <br /> 1. Contact the local fire department and the San Joaquin Valley Air Pollution Control <br /> District for any applicable permits and requirements. <br /> 2. Any changes in information and scope of work must be submitted to EHD for approval <br /> prior to commencing work. All new addenda supersede the previous ones. <br /> 3. Contact Stacy Rivera at (209) 468-3440 to arrange the following inspection <br /> appointments (a 48-hour notice is required for inspection appointments). Please be <br /> aware that inspections for emergency work must be scheduled within five days of permit <br /> approval. <br /> a. Sensor functionality: Functionality of the monitoring system must be verified to <br /> ensure that monitoring has been restored to meet the requirements of Title 23 <br /> California Code of Regulations and the Health & Safety Code. A copy of the alarm <br /> history shall be printed prior to performing the "cold start" of the Veeder Root system <br /> and made available at the time of EHD inspection. <br /> b. 24-hour hydrostatic test (or equivalent) on diesel east sump. <br /> c. Secondary containment testing on diesel piping. <br /> Please be aware that the facility cannot operate the UST system OR receive fuel in <br /> the diesel east tank prior to the EHD inspection and approval. <br /> 4. If concrete will be broken near the USTs and/or piping, a secondary containment test <br /> must be performed on the USTs and/or piping once concrete is poured in accordance <br /> with the manufacturer's guidelines. <br />