My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2011-2015
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
TRACY
>
3940
>
2300 - Underground Storage Tank Program
>
PR0507837
>
COMPLIANCE INFO_2011-2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/21/2024 4:52:42 PM
Creation date
6/3/2020 9:59:32 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2011-2015
RECORD_ID
PR0507837
PE
2361
FACILITY_ID
FA0008057
FACILITY_NAME
TRACY TRUCK AND AUTO STOP
STREET_NUMBER
3940
Direction
N
STREET_NAME
TRACY
STREET_TYPE
BLVD
City
TRACY
Zip
95304
APN
21220004
CURRENT_STATUS
01
SITE_LOCATION
3940 N TRACY BLVD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0507837_3940 N TRACY_2011-2015.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
517
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Aug 02 11 08:49a Elit IV Contactors 12094616342 p.3 <br />SWRCB, January 2002 �(,i (m Page of <br />5. SECONDARY PIPE TESTING o <br />Test Method Developed By: G Piping Manufacturer "R Industry Standard ❑ Professional Engineer <br />D Other (Spec) <br />Test Method Used:. Pressure D Vacuum D Hydrostatic <br />E Other (Specify) _ <br />Test Equipment Used: Equipin ,t Resolution: <br />EMEEMEEMPiping Run # Piping Run # Pipinl; .0 n # Piping Run # <br />Piping Material: CA 1,45_ -- <br />Piping Manufacturer: <br />Piping Diameter: <br />Length of Piping Run: <br />Product Stored: <br />[ <br />_ - <br />Method and location of <br />piping -run isolation: <br />Wait time between applying <br />pressure/vacuum/water and <br />starting test: <br />-5 <br />— - <br />Test Start Time: <br />— -- <br />initial Reading (R+): <br />Test End Time: <br />_ -- <br />Final Reading (RF): <br />Test Duration: <br />— -- <br />Change in Reading (RF -RI): <br />6-y <br />Pass/Fail Threshold or <br />Criteria: <br />— <br />Test Result: <br />Pass © Fail D Pass ❑ Fail <br />❑Pas D Fail <br />El Pass Fail <br />Comments (include information on repairs made prior to testing, and recommender J !fow-up orfailed tests) <br />t, — <br />
The URL can be used to link to this page
Your browser does not support the video tag.