Laserfiche WebLink
Aug 02 11 08:49a Elit IV Contactors 12094616342 p.3 <br />SWRCB, January 2002 �(,i (m Page of <br />5. SECONDARY PIPE TESTING o <br />Test Method Developed By: G Piping Manufacturer "R Industry Standard ❑ Professional Engineer <br />D Other (Spec) <br />Test Method Used:. Pressure D Vacuum D Hydrostatic <br />E Other (Specify) _ <br />Test Equipment Used: Equipin ,t Resolution: <br />EMEEMEEMPiping Run # Piping Run # Pipinl; .0 n # Piping Run # <br />Piping Material: CA 1,45_ -- <br />Piping Manufacturer: <br />Piping Diameter: <br />Length of Piping Run: <br />Product Stored: <br />[ <br />_ - <br />Method and location of <br />piping -run isolation: <br />Wait time between applying <br />pressure/vacuum/water and <br />starting test: <br />-5 <br />— - <br />Test Start Time: <br />— -- <br />initial Reading (R+): <br />Test End Time: <br />_ -- <br />Final Reading (RF): <br />Test Duration: <br />— -- <br />Change in Reading (RF -RI): <br />6-y <br />Pass/Fail Threshold or <br />Criteria: <br />— <br />Test Result: <br />Pass © Fail D Pass ❑ Fail <br />❑Pas D Fail <br />El Pass Fail <br />Comments (include information on repairs made prior to testing, and recommender J !fow-up orfailed tests) <br />t, — <br />