My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2011-2015
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
TRACY
>
3940
>
2300 - Underground Storage Tank Program
>
PR0507837
>
COMPLIANCE INFO_2011-2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/21/2024 4:52:42 PM
Creation date
6/3/2020 9:59:32 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2011-2015
RECORD_ID
PR0507837
PE
2361
FACILITY_ID
FA0008057
FACILITY_NAME
TRACY TRUCK AND AUTO STOP
STREET_NUMBER
3940
Direction
N
STREET_NAME
TRACY
STREET_TYPE
BLVD
City
TRACY
Zip
95304
APN
21220004
CURRENT_STATUS
01
SITE_LOCATION
3940 N TRACY BLVD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0507837_3940 N TRACY_2011-2015.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
517
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
F. to -Tank Gauging / SIR Equipment: i i Check this box if tanka i <br />g ug ng is used only for inventory control. <br />I I Check this box if no tarn gauging or SIR equipment is installed. <br />This section must be completed if in -tank gauging equipment is used to perform leak detection monitoring. <br />Com ete the foil lowl c ist: <br />❑ Yes - No. Has all input wiring been inspected for proper entry and termination, including testing for ground faults? <br />n Yes - No. Were all tank gauging probes visually inspected for damage and residue buildup? <br />❑ Yes - No' Was accuracy of system product level readings tested? <br />n Yes - No' Was accuracy of system water level readings tested? <br />❑ Yes - No' Were all probes reinstalled properly? <br />In Yes - No' Were all items on the equipment manufacturers maintenance checklist completed? <br />' In the Section H, below, describe how and when these deficiencies or will tse corrected. <br />G. Line Leak Detectors (LLD): n Check this box if LLDs are not installed. <br />i <br />- No' For equipment start-up or annual equipment certification, was a leak s <br />N/A that apply) Simulated leak rate: g.p.h.; n O.t g.p.h ; - 0.2 <br />9•R•h- <br />No'Were ail LLDs (4:1nfimtill operational and accurate within regulatory rek <br />No' Was the testing apparatus properly calibrated? <br />No' For mechanical LLDs, does the LLD restrict product flow if it detects a I <br />- N/A <br />- No' For electronic LLDs, does the turbine autnmatirrofk, <br />A <br />No' <br />For electronic LL <br />WA <br />disconnected? <br />-ZFor <br />electronic LL <br />_ <br />fails a test? <br />- No' <br />N/A <br />For electronic LU <br />- No' <br />Were all items on <br />to <br />a <br />any portion of the monitoring system is <br />any portion of the monitoring system mal <br />monitoring system Certifficaflon <br />Page 3 of s <br />12/QT <br />3 2/21/07 <br />or <br />or <br />
The URL can be used to link to this page
Your browser does not support the video tag.