My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2008-2011
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
3355
>
2300 - Underground Storage Tank Program
>
PR0508352
>
COMPLIANCE INFO_2008-2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2021 4:50:21 PM
Creation date
6/3/2020 9:59:36 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2008-2011
RECORD_ID
PR0508352
PE
2361
FACILITY_ID
FA0008044
FACILITY_NAME
CHEVRON STATION #1731*
STREET_NUMBER
3355
Direction
E
STREET_NAME
HAMMER
STREET_TYPE
LN
City
STOCKTON
Zip
95212
APN
12618007
CURRENT_STATUS
01
SITE_LOCATION
3355 E HAMMER LN
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0508352_3355 E HAMMER_2008-2011.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
323
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Emergency Stop Switch Test <br /> WO#/Date 2279625 02/24/2011 <br /> Site ID 208118 <br /> Street address 3355 E. HAMMER LANE @ HOLMAN RD <br /> City,ST STOCKTON, CA <br /> Total Time Testing E-Stop 5MIN <br /> Shut Down <br /> Location of E-Stop <br /> Turbine(Y/N) Dispenser(Y/N) Comments/Repairs <br /> Outside Wall Yes <br /> Inside Wall Yes <br /> Other <br /> Did ESO function correctly(remove 220 from both sides of the relay)? YES NO <br /> Test Result (PASS / FAIL) PASS <br /> If the test FAILS call the Elite Customer Solutions Center Immediately. <br /> Date/Time/Name at Help Desk notified <br /> If the test FAILS teach the site personnel alternative emergency shut down procedure <br /> (e.g. Circuit breakers, pump controller) <br /> Date/Time/Name at employee trained <br /> If system does not turn back on when the E-Stop is reactivated,the site personell are to contact the BP Help Desk. The <br /> Help desk will talk them through resetting the E-Stop and/or issue a 4 hour contractor response. <br /> Technician Signature/Date 02/24/2011 <br /> Rev:March 2007 <br />
The URL can be used to link to this page
Your browser does not support the video tag.