Laserfiche WebLink
UNDERGROUND STORAGE TANK ' <br />RESPONSE PLAN — PAGE 1` One form er facility) <br />TYPE OF ACTION ❑ 1. NEW PLAN ❑ 2. CHANGE OF INFORMATION Rol. <br />I. FACILITY INFORMATION g s TFi <br />FACILITY ID # (Agency Use Only) <br />I <br />BUSINESS NAME (Same as FACILITY NAME) 3 - <br />Chevron Station # 208118 <br />BUSINESS SITE ADDRESS 103 <br />BUSINESS SITE CITY 104 <br />3355 1:✓ Hammer Ln <br />Stockton, CA 95212 <br />II. SPILL CONTROL AND CLEANUP METHODS <br />This plan addresses unauthorized releases from UST systems and supplements the emergency response plans and procedures in the facility's Hazardous Materials <br />Business Plan (HMBP). <br />➢ If safe to do so, facility personnel will take immediate measures to control or stop any release (e.g., activate pump shut-off, etc.) and, if necessary, safely remove <br />remaining hazardous material from the UST system. <br />➢ Any release to secondary containment will be pumped or otherwise removed within a time consistent with the ability of the secondary containment system to <br />contain the hazardous material, but not greater than 30 calendar days, or sooner if required by the local agency. Recovered hazardous materials, unless still suitable <br />for their intended use, will be managed as hazardous waste. <br />➢ Absorbent material will be used to contain and clean up manageable spills of hazardous materials. Absorbent material which has become too saturated to be <br />effective or which is no longer intended for use will be managed as hazardous waste unless a waste determination in accordance with 22 CCR §66262.11 finds that <br />it is non -hazardous. Used absorbent material, reusable or waste, will be stored in a properly labeled and sealed container. Waste material shall be disposed of <br />appropriately. <br />➢ Facility personnel will determine whether any water removed from secondary containment systems, or from clean-up activity, has been in contact with any <br />hazardous material. If the water is contaminated, it will be managed as hazardous waste unless a hazardous waste determination in accordance with 22 CCR <br />§66262.11 finds that it is non -hazardous. If the water has a petroleum sheen (i.e., rainbow colors), it is contaminated. A thick floating petroleum layer may not <br />necessarily display rainbow colors. Water (hazardous or non -hazardous) from sumps, spill containers, etc. will not be disposed to storm water systems. <br />➢ We will review secondary containment systems for possible deterioration if any of the following conditions occur: <br />1. Hazardous material in contact with secondary containment is not compatible with the material used for secondary containment; <br />2. Secondary containment is prone to damage from any equipment used to remove or cleanup hazardous material collected in secondary containment, <br />3. Hazardous material, other than the product/waste stored in the primary containment system, is placed inside secondary containment to treat or neutralize <br />released product/waste, and the added material or resulting material from such a combination is not compatible with secondary containment. <br />III. SPILL CONTROL AND CLEAN-UP EQUIPMENT <br />PERIODIC MAINTENANCE: Spill control and clean-up equipment kept permanently on-site is listed in the facility's Hazardous Materials Business Plan. This <br />equipment is inspected at least monthly, and after each use, supplies are replenished as needed. Defective equipment is repaired or replaced as necessary. <br />EQUIPMENT NOT PERMANENTLY ON-SITE, BUT AVAILABLE FOR USE IF NEEDED: (Complete only i alicable) <br />EQUIPMENT <br />LOCATION <br />AVAILABILITY <br />RIO. <br />R20. <br />R30. <br />R11 <br />R21- <br />R31. <br />R12. <br />R22. <br />R32. <br />R13, <br />R23. <br />R33. <br />RI4. <br />R24. <br />R34, <br />R15. <br />R25. <br />R35. <br />IV. RESPONSIBLE PERSONS <br />THE FOLLOWING PERSON(S) IS/ARE RESPONSIBLE FOR AUTHORIZING ANY WORK NECESSARY UNDER THIS RESPONSE PLAN: <br />NAME R40 <br />TITLE R50. <br />Chevron Emergency Int'( Center <br />CEIC 500-231-0623 <br />NAME R41 <br />TITLE R51 <br />Chevron Maintenance Dispatch <br />elDesk 866-845-4254 <br />NAME R42 <br />TITLE R52, <br />NAME R43- <br />TITLE R53. <br />V. MONITORING INDICATORS <br />IF MONITORING INDICATES A POSSIBLE UNAUTHORIZED RELEASE, STEPS TO VERIFY THE RELEASE WILL BE MADE AS FOLLOWS: <br />® 1. ADDITIONAL SYSTEM TESTING OR DATA COLLECTION ® 2. INSPECTION BY QUALIFIED PERSONS ® 3. RECALIBRATION OF EQUIPMENT R60 <br />® 99. OTHER (Specify): The affected UST System will be shut down for a third parry precision test(s) to verify and isolate if a release has occurred. R61 - <br />UN -022B - 1/6 www.unidocs.org Rev. 04/02/08 <br />