Laserfiche WebLink
ac111LjcDit2 <br />HEVRON STATION #1731* CERS ID <br />355 E HAMMER LN 10182331 <br />TOCKTON, CA 95212 Tank ID#: TA0508353 <br />ubmitta$tatus ;. <br />ubmitted on 3/3/2017 by Charles Bittle of Chevron Products Company (A Division of Chevron U.S.A. Inc.) (San Ramon) <br />omments by submitter: Per the request on the 2/6/2017 UST Inspection Report, I am resubmitting the UST element with revised UST Forms. If you have questions or <br />f further action is necessary, please contact Charles Bittle at cbittle@chevron.com or call 925-842-9002. <br />_-ECVE.-U, <br />ype of Action <br />Type of Action (UST Tank) EI <br />Confirmed/Updated Information <br />cility,Onformation <br />EVRON STATION #1731* <br />Tank Contents <br />i5 E HAMMER LN <br />Regular Unleaded <br />)CKTON, CA 95212 <br />Other Petroleum Contents <br />Other Non -Petroleum Contents <br />nk Description' <br />ik ID# <br />Date UST System Installed <br />)508353 <br />7/15/1999 <br />ik Manufacturer <br />Date Existing UST Discovered <br />tXES <br />ik Capacity In Gallons <br />Date UST Permanently Closed <br />)00 <br />Tank Use'and Gontgots <br />Tank Use <br />Tank Contents <br />Motor Vehicle Fueling <br />Regular Unleaded <br />Other Petroleum Contents <br />Other Non -Petroleum Contents <br />ENVIRONMENTAL DEALT <br />Tank Configuration <br />A Stand-alone Tank <br />Number of Compartments in the Unit <br />1 <br />Additional Description <br />T2 -REGULAR (PER VEEDER ROOT <br />PROGRAMMING) <br />6n' k"Covastruction <br />Type of Tank <br />Double Wall <br />Primary Containment Secondary Containment <br />Fiberglass Fiberglass <br />Dverfill Protection <br />Audible/Visual Alarms Yes Fill Tube Shut -Off Valve <br />Ball Float Exempt <br />lfsPping,rodue onstrLcon�11 <br />w., = <br />Piping Construction Primary Containment Secondary Containment Piping/Turbine Containment Sump <br />Double -walled Fiberglass Fiberglass Single -walled <br />Piping System Type <br />Pressure <br />Vent, Uapor Recovery (VR)nd Riser /:<Fill Pipe Piping Construction <br />Drimary Containment Vapor Recovery Primary Containment Riser Pipe Primary Containment Vent Piping Transition Sumps <br />Fiberglass Fiberglass Steel None <br />Fill Components Installed <br />Secondary Containment Vapor Recovery Secondary Containment Riser Pipe Secondary Containment Yes Spill Bucket <br />None None None Yes Striker Plate/Bottom Protector <br />Containment Sum <br />nder Dispenser' C6rifainmen UDC : ;, on, ion`Protection' <br />onstruction Type Construction Material Sacrificial Anode <br />Ingle -walled Fiberglass Impressed Current <br />Yes Isolation <br />Printed on 3/3/2017 12:26 PM <br />