My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2012-2018
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
3355
>
2300 - Underground Storage Tank Program
>
PR0508352
>
COMPLIANCE INFO_2012-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/8/2021 9:09:56 AM
Creation date
6/3/2020 9:59:38 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2012-2018
RECORD_ID
PR0508352
PE
2361
FACILITY_ID
FA0008044
FACILITY_NAME
CHEVRON STATION #1731*
STREET_NUMBER
3355
Direction
E
STREET_NAME
HAMMER
STREET_TYPE
LN
City
STOCKTON
Zip
95212
APN
12618007
CURRENT_STATUS
01
SITE_LOCATION
3355 E HAMMER LN
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0508352_3355 E HAMMER_2012-2018.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
492
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
7. UNDER-DISPENSER CONTAINMENT(UDC)TESTING <br /> Test Method Developed By: ❑UDC Manufacturer M Industry Standard ❑Professional Engineer <br /> ❑Other(Specify) <br /> Test Method Used: ❑Pressure ❑Vacuum ®Hydrostatic <br /> ❑Other(Spec) <br /> Test Equipment Used: See attached testing procedures Equipment Resolution: Inches <br /> UDC# 9/10 UDC# 11/12 UDC# UDC# <br /> UDC Manufacturer: <br /> UDC Material: Fiberglass Fiberglass <br /> UDC Depth: 30° 30° <br /> Height from UDC Bottom to Top $„ $„ <br /> of Highest Piping Penetration: <br /> Height from UDC Bottom to 5^ 5° <br /> Lowest Electrical Penetration: <br /> Condition of UDC prior to <br /> Fair Fair <br /> testing: <br /> Portion of UDC Tested' 4"Above highest penetration 4"Above highest penetration <br /> Does turbine shut down when <br /> UDC sensor detects liquid(both N/A N/A <br /> product and water)?* <br /> Turbine shutdown response time N/A N/A <br /> Is system programmed for fail- <br /> safe shutdown?` E]Yes [:]No ®NA ElYes ❑No p NA ElYes ElNo ElNA ❑Yes ElNo ElNA <br /> Was fail-safe verified to be ❑Yes ❑No M NA ❑Yes ❑No M NA ❑Yes ❑No ❑NA ❑Yes ❑No ❑NA <br /> operational?* <br /> Wait time between applying <br /> pressure/vacuum/water and 15 minutes 15 minutes <br /> starting test <br /> Test Start Time: 10:55am 10:55am <br /> Initial Reading(RI): 1.60598 Inches 0.61816 Inches Inches Inches <br /> Test End Time: 11:10am 11:10am <br /> Final Reading(RF): 1.60629 Inches 0.61838 Inches Inches Inches <br /> Test Duration: 15 mins 15 mins <br /> Change in Reading(RF-R,): 0.00031 0.00022 <br /> Pass/Fail Threshold or Criteria: 0.002 0.002 <br /> Test Result: p Pass ❑Fail ® Pass ❑Fail ❑ Pass ❑Fail ❑ Pass ❑Fail <br /> Was sensor removed for testing? ®Yes ❑No ❑NA ®Yes ❑No ❑NA ❑Yes ❑No ❑NA ❑Yes ❑No ❑NA <br /> Was sensor properly replaced and ®Yes ❑No ❑NA p Yes ❑No ❑NA ❑Yes ❑No ❑NA ❑Yes ❑No ❑NA <br /> verified functional after testing? <br /> Comments—(include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />
The URL can be used to link to this page
Your browser does not support the video tag.