Laserfiche WebLink
0 SAN JOAQUIN COUNTY • <br />ENVIRONMENTAL HEALTH DEPARTMENT <br />1868 East Hazelton Avenue, Stockton, California 95205-6232 <br />Telephone: (209) 468-3420 Fax: (209) 468-3433 Web: www.sjgov.org/ehd <br />UNDERGROUND STORAGE TANK (UST) PROGRAM INSPECTION REPORT <br />Facility Chevron <br />Facility 3355 E Hammer Lane, Stockton <br />Inspection 2-22-13 <br />Name: <br />Address: <br />Date: <br />�'tay: Daniel Ahumada <br />Tltle: Manager <br />Phone: 477-3699 <br />Inspection <br />Type: <br />X Routine X Monitoring System <br />Certification i i Installation i I Complaint - ID#. I i Other: <br />(Authority HSC 25289) d <br />Manager <br />Daniel Ahumada Ma <br />maa <br />Consent for. <br />kii Inspection ❑Sampling 7�Photos <br />Granted by: Title: <br />Monitoring <br />Panel: Veeder-Root TLS -350 <br />Piping <br />System: XPressurized n Suction ❑ Gravity <br />Overfill <br />Prevention: XMechanical i i Audible/visual <br />UST1 <br />2 <br />-------------- <br />- - - - - <br />- - - --------------- <br />-- - - - - - <br />-Product - <br />-87 octane - <br />- 91 octane - <br />- - ----------------------- <br />- - - - - --------------- <br />- - - - -- - <br />- <br />- - <br />Designated Edward Dahlgren <br />Aerator. <br />ICC <br />C eExp. 6-28-14 <br />Violations: u M1 -Release Detection n M2 -Release Prevention f I M3 - Both <br />Site Service Stephen Willems <br />P <br />ICCEx Manufacturers gY 8-9-14 Manufacturers <br />VR 6-8-14, VMI/Tanknolo <br />Te <br />Technician: <br />Date: Training: <br />Dat <br />VIOLATIONS <br /># <br />I C1 <br />C2 <br />M <br />Code Section <br />HSC = California Health and Safety Code- CCR = California Code of Regulations <br />C 1 = Class 1 violation; C2 = Class 2 violation; M = Minor violation <br />File Review <br />101 <br />HSC 25284 <br />No permit to operate <br />102 <br />HSC 25404.5 <br />Annual operating fees not paid <br />103 <br />HSC 25284(a)(3) <br />No written agreement between the person that the operating permit was issued to and the tank operator to <br />monitor the tanks stem <br />104 <br />HSC 25292.2 <br />Current financial responsibility documents not on file with the Environmental Health Department (EHD) <br />105 <br />CCR 2711 <br />Current Unified Program Consolidated Forms not on file with the EHD (Facility and tank form) <br />106 <br />CCR 2632(b) <br />Monitoring Program (Monitoring & Response Plans) is not current or approved by the EHD <br />107 <br />CCR 2632(d)(1)(C) <br />Plot plan/site map not submitted or fails to completely show where monitoring is performed <br />108 <br />CCR 2637 <br />Secondary containment: (a) test not performed; (e) test report not submitted within 30 days; (f) test notification <br />not provided to the EHD at least 48 hours prior to conducting the test <br />Monitoring equipment certification: (a) not performed annually; (d) test report not submitted within 30 days; <br />109 <br />CCR 2638 <br />(e) test notification not provided to the EHD at least 48 hours prior to conducting an installation, repair, <br />replacement, calibration, or certification <br />110 <br />HSC 25291 (0 <br />Annual line leak detector test not performed (M7) <br />111 <br />HSC 25284.2 <br />Annual spill containment testing not performed <br />112 <br />CCR 2636(f)(4) <br />Annual line tightness test not performed if positive shutdown or fail safe not present (M1) <br />113 <br />CCR 2715(a) <br />Failed to inform the EHD of a change of designated operator within 30 days <br />114 <br />CCR 2715(b) <br />Designated operator does not possess a current ICC CA UST System Operator certification <br />115 <br />CCR 2660(k) <br />Repair for tank or piping not tested for tightness after completion of the repair pursuant to (M2) <br />permit conditions <br />116 <br />HSC 25292.5 <br />Enhanced leak detection (ELD) testing not performed on a system located within 1000' of public well, or <br />failures not repaired and retested <br />117 <br />CCR 2661 <br />Permit to repair UST system not obtained <br />118 <br />HSC 25286(a) <br />Operational permit not amended when UST storage and/or monitoring system changed <br />119 <br />HSC 25298(b) <br />Permit to temporarily Gose UST system not obtained <br />120 <br />HSC 25298(c) <br />Permit to close UST system not obtained <br />On Site Records <br />Maintenance & monitoring records not maintained 3 years, cathodic protection records for 6'/2 years, written <br />performance claims pertaining to release detection systems for 5 years, or records of repairs, linings, and <br />201 <br />CCR 2712(b) <br />upgrades for the life of the tank. Monitoring records include: (1) date and time of all monitoring or sampling; <br />(2) monitoring equipment calibration and maintenance records; (3) results of any visual observations; (4) <br />results of sample analysis performed a lab or in the field; (5) logs of all readings of gauges or other monitoring <br />equipment, round water elevations, or other test results; 6 results of inventory readings and reconciliations <br />202 <br />CCR 2712(i) <br />Monitoring plan, response plan, and/or operating permit and all conditions not onsite <br />Unauthorized release that: (c) did not escape secondary containment and cleaned up within eight hours (M1) <br />203 <br />CCR 2650 <br />was not recorded; (e) escaped secondary containment, not cleaned up after eight hours, or a sudden loss of <br />product was not reported to the EHD within 24 hours <br />Inspedor. Reoei Title: <br />Garrett Backus (209) 468-2986 u vc� <br />=Hn 93-1719 Rev n4119119 Paae 1 UY INSPECTION REPOR <br />