My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2012-2018
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
3355
>
2300 - Underground Storage Tank Program
>
PR0508352
>
COMPLIANCE INFO_2012-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/8/2021 9:09:56 AM
Creation date
6/3/2020 9:59:38 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2012-2018
RECORD_ID
PR0508352
PE
2361
FACILITY_ID
FA0008044
FACILITY_NAME
CHEVRON STATION #1731*
STREET_NUMBER
3355
Direction
E
STREET_NAME
HAMMER
STREET_TYPE
LN
City
STOCKTON
Zip
95212
APN
12618007
CURRENT_STATUS
01
SITE_LOCATION
3355 E HAMMER LN
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0508352_3355 E HAMMER_2012-2018.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
492
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
7. AL -DISPENSER CONT (U ENT ) TESTING Page 6 of 8 <br />Test Method Developed By: ❑ UDC Manufacturer ® Industry Standard ❑ Professional Engineer <br />❑ Other (Specify) <br />Test Method Used: ❑ Pressure ❑ Vacuum ® Hydrostatic <br />❑ Other (Specify) <br />Test Equipment Used: See attached testing procedures. <br />Equipment Resolution: <br />UDC #9/10 <br />UDC #11/12 <br />UDC# <br />UDC# <br />UDC Manufacturer: <br />UDC Material: <br />Fiberglass <br />Fiberglass <br />UDC Depth: <br />30" <br />30" <br />Height from UDC Bottom to Top <br />of Highest Piping Penetration: <br />8" <br />8" <br />Height from UDC Bottom to <br />Lowest Electrical Penetration: <br />5" <br />5" <br />Condition of UDC prior to <br />testing: <br />Fair <br />Fair <br />Portion of UDC Tested <br />Above highest <br />penetration <br />Above highest <br />penetration <br />Above highest <br />penetration <br />Above highest <br />penetration <br />Does turbine shut down when <br />UDC sensor detects liquid (both <br />product and water)?. <br />❑ Yes ❑ No ® NA <br />❑Yes ❑ No ® NA <br />❑ Yes ❑ No ® NA <br />❑ Yes ❑ No ® NA <br />Turbine shutdown response time <br />Is system programmed for fail- <br />safe shutdown?* <br />❑ Yes ElNo ®NA <br />❑Yes E]No ®NA <br />El Yes [:1No ®NA <br />[:1 Yes ElNo ®NA <br />Was fail-safe verified to be <br />operational?* <br />r_1 Yes ElNo ®NA <br />❑Yes E]No ®NA <br />F1 Yes F1No ®NA <br />❑Yes ❑ No ®NA <br />Wait time between applying <br />pressure/vacuum/water and <br />starting test <br />30 minutes <br />30 minutes <br />30 minutes <br />30 minutes <br />Test Start Time: <br />10:52am <br />10:56am <br />Initial Reading (RI): <br />2.2029 <br />2.7237 <br />Test End Time: <br />11:07am <br />ll:llam <br />Final Reading (RF): <br />2.2024 <br />2.7236 <br />Test Duration: <br />15 min <br />15 in <br />15 min <br />15 min <br />Change in Reading (RF -RI): <br />0.00050 <br />0.00010 <br />Pass/Fail Threshold or Criteria: <br />0.002 <br />0.002 <br />0.002 <br />0.002 <br />Test Result: <br />® Pass I ❑ Fail <br />® Pass ❑ Fail <br />❑ Pass ❑ Fail , <br />❑ Pass . ❑ Fail <br />Was sensor removed for testing? <br />®Yes ❑No ❑ NA <br />®Yes [-]No [-INA <br />®Yes ❑No ❑NA <br />®Yes [-]No ❑ NA <br />Was sensor properly replaced and <br />verified functional after testing? <br />®yes [:]No ❑ NA <br />®Yes ❑No ❑NA <br />ZYes ❑No ❑ NA <br />®Yes ❑No ❑ NA <br />Comments — (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />' If the entire depth of the UDC is not tested, specify how much was tested. If the answer to M of the questions indicated with an <br />asterisk(*) is "NO" or "NA", the entire UDC must be tested. (See SWRCB LG -160) <br />
The URL can be used to link to this page
Your browser does not support the video tag.