Laserfiche WebLink
' <br />9. SPILL/OVERFILL CONTAINMENT BOXES <br />Page 8 of 8 <br />Facility is Not Equipped With Spill/Overfill Containment Boxes ❑ <br />Spill/Overfill Containment Boxes are Present, but were Not Tested ❑ <br />Test Method Developed By: <br />❑ Spill Bucket Manufacturer ® Industry Standard ❑Professional Engineer <br />❑ Other (Spec) <br />Test Method Used: <br />❑ Pressure ❑ Vacuum ® Hydrostatic <br />❑ Other (Spec) <br />Test Equipment Used: See attached testing procedures <br />Equipment Resolution: <br />Spill Box # 87 fill <br />Spill Box # 91 fill <br />Spill Box # 87 vapor <br />Spill Box #91 vapor <br />Bucket Diameter & Brand: <br />12" Philtite <br />12" Philtite <br />12" Philtite <br />12" — Philtite <br />Bucket Depth: <br />14.5" <br />14.5" <br />15.5" <br />15.5" <br />Wait time between applying <br />pressure/vacuum/water and <br />starting test: <br />30 Minutes <br />30 Minutes <br />30 Minutes <br />30 Minutes <br />Test Start Time: <br />Visual Fail <br />Visual Fail <br />8:52AM <br />9:10AM <br />Initial Reading (R): <br />4.4968 <br />4.4574 <br />Test End Time: <br />9:07AM <br />9:25AM <br />Final Reading (RF): <br />4.4984 <br />4.4588 <br />Test Duration: <br />15 min <br />15 min <br />15 min <br />15 min <br />Change in Reading (RF -RI): <br />0.00147 <br />0.00140 <br />Pass/Fail Threshold or <br />Criteria: <br />0.002 <br />0.002 <br />0.002 <br />0.002 <br />Test Result: <br />❑ Pass ®Fail <br />❑ Pass Z Fail <br />ZPass ❑ Fail <br />1 ® Pass ❑ Fail <br />Comments— (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />87 & 91 Fill Buckets leaking (Philtite) — leaks at upper O'Ring or Drain Valve <br />