My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1999-2005
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
FRANK WEST
>
120
>
2300 - Underground Storage Tank Program
>
PR0515365
>
COMPLIANCE INFO_1999-2005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/12/2021 10:06:56 AM
Creation date
6/3/2020 9:59:41 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1999-2005
RECORD_ID
PR0515365
PE
2361
FACILITY_ID
FA0012107
FACILITY_NAME
A TEICHERT & SON INC*
STREET_NUMBER
120
STREET_NAME
FRANK WEST
STREET_TYPE
CIR
City
STOCKTON
Zip
95206
APN
19342006
CURRENT_STATUS
01
SITE_LOCATION
120 FRANK WEST CIR
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0515365_120 FRANK WEST_1999-2005.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
458
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MAY 08 2003 8: 56RM H LRSERJET 3200 r +r rri rtuam rHut p. 3 <br /> i <br /> ' F. In-Tack Gau&ging/SIR Equipment; O Check this box if tank <br /> gauging is used only fon inventory control. <br /> 0 Check this box if no tank gauging or Slit equipment is installed, <br /> This section must be completed if in-tank gauging equipment is used to perform leak detection monitoring. <br /> Com lets the folio Ing checklist: <br /> P-Pyes O No" Has all input wiring been inspected for <br /> proper eatxy and ts:rt:tinatian,iaciudiag testing 1i7r ground faults? <br /> Yes ® No« Were all tank gauging probes visually" ted for damSe and residue buildup? <br /> ;'Yes O Ne Was accuracy of system product level fmclings tested? <br /> fYes ® No" Was accuracy of system water level readings tested? <br /> Yes -UNT Were all probes reinstalled properly? <br /> Yes O No" Were all items on the equipment mamdututes maintettaace checklist campleted? <br /> "In the Section H,below,describe how and schen these deficiencies were or will be corrected. <br /> I <br /> G. Line Leak Detectors (LLD): 0 Check this box if LLDs arc not installed. <br /> Com late the foliowin checklist: <br /> z Yes Q No" For equipment start-up or annual equipment cert cation, was's leak simulated to verify LLD performance? <br /> O NIA (Check ali that apply) Simulated leak rate; 90 g.p.h.; Cl 0.1 g.p.h; Cl 0.2 g.p.h. <br /> Yes D No* Wrrc ail LLDs confirmed operational and accurate within regulatory requiremenpp <br /> OE Yes Cl No' Was the testing apparatus properly calibrated? <br /> ,U Yes Q No' For nnechanical LLDs,does the LLD restrict product flow if it detects a leak? <br /> O NIA <br /> 0 Yes O No, For electronic LLDs,does the turbine automatically shut off if the LLD detects a leak? <br /> IIIA <br /> Q Yes ❑ No* For electronic LLDs, does the turbine automatically slutt off if any portion of the monitoring system is disabled <br /> JZ NIA or disconnected? <br /> Cl Yes Cl No" For electronic LLDs,does the turbine automatically shut off if any portion of the monitariAg system malfunctions <br /> N/A or fails a test'? <br /> ® Yes O Ne For electronic LLDs,have all accessible wiring connections been visually inspected? <br /> gr NIA <br /> ,id Yes Cl Nos Lwere all items on the equipment manufacturer's maintenance checklist completed? <br /> s In tht Section H,below,describe how and when these deficiencies were or will be corrected. <br /> H. Comments; Ad �,rd ofit rC,5-v( S Leask cC*V'13 �o <br /> h P Gee. k m er S cpf ( 1 Dtgvf f-a _ k .S"d <br /> Page 3 of 3 031ti1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.