Laserfiche WebLink
11 14/G�tlj 1 C1:,iYJ Gt97Nob.34.iJ t It 1 M I-L ULIK PAGE 04 <br /> R � <br /> F. In-Tank Gauging I SIR Equipment., a--check this box if tank g is used only for inventory control. <br /> O Check this box if no tank gauging or SIR'equipment is installed. <br /> This section must be completed if in-tank gauging equipment is used to perform leak detection monitoring. <br /> Com lets the folut InZ checklist: <br /> Yes O No* Has all input wing been inspected for proper entry and tion,including testing for ground faults? <br /> a-Yes Cl No* Were all tank gauging probes visually inspected for damage and residue buildup? <br /> Yes O No* Was accuracy of system product level readings tested? <br /> Yes O No* Was accuracy of system water level readinss tested? <br /> O'Yes O No* Were all probes reinstalled properly? <br /> Yes ® No* Were all items on the equipment manufacturer's maintenance checklist completed? <br /> " In the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> G. Line Leak Detectors (LLD): O Check this box if LLDs are not installed. <br /> Cam lets the foliowin checklist: <br /> Yes O No* For equipment start-up or annual equipment cert cation, was a leak Simulated to verify LLD performance? <br /> O NIA (Check all that apply) Simulated leak rate:01 g.p.h.; O 0.1 g.p.h; U 0.2 g.p.h. <br /> Yes O No* Were all LLDs confirmed operational and accurate within regulatory requirements? <br /> Z-Yes Cl No* Was the testing apparatus properly calibrated? <br /> Yes O No* For mechanical LLDs,does the LLD restrict product flow if it detects a leak? <br /> O N/A <br /> Q Yes 0 No• For electronic LLDs,does the turbine automatically shut off if the LLD detects a leak? <br /> .ErNtA <br /> O Yes O No* For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system is disabled <br /> NIA or disconnected? <br /> Cl Yes O No* For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system malfunctions <br /> -00'NIA or fails a test? <br /> Cl Yes O No* For electronic LLDs,have all acccssiible wiring connections been visually inspected? <br /> IE i'- A <br /> ,1*3'Yes O No* Were all items on the equipment ewrer's maintenance checklist completed? <br /> * In the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> H. Comments: <br /> Wage 3 of 3 03MI <br />