Laserfiche WebLink
s 8t 2 <br /> INSTRUCTIONSCOATINGF "C": TANS INSTAL Tl CERTIFICATION <br /> R <br /> GENERAL INSTRUCTIONS <br /> ' <br /> 1. Each tank system must be in compliance with the federal and state technical <br /> standards, contained in law and regulations, for tank and piping installation. <br /> This certification shall be completed by either the UST owner or representative. <br /> 3, One certification is required for each tank system; This form shall be used to <br /> make the required certification. <br /> Please type or print clearly all requested iform tion (for printing, please use <br /> hard point writing instrument). <br /> . Submitthe completed certification to the appropriate Local Implementing ncy. <br /> 1. INSTALLATION* ALL OF THE ITEMS THAT APPLYT INDICATE THAT THE <br /> INSTALLATION REQUIRE FLATS ARE MET. <br /> It. OATH: THE TANK OWNERAGENT SHALL CERTIFY, BY SIGNING THE <br /> CERTIFICATION, THAT THE INFORMATION PROVIDED IS TRUE AND <br /> ECT, THE p SHOULD PRINTED F l T <br /> __ SIGNATURE. <br />