Laserfiche WebLink
02/01/2000 13:49 2093651543 TANKNOLOGY PAGE 05 <br /> INDIVIDUAL TANK INFORMATION AND TEST RESULTS <br /> .fir TanWwfogy <br /> TEST DATE:12/10/99 8904 SHOAL CREEK,BUILDING 200 WORK ORDER NUMBER2210731 <br /> CLIENT:SAVIDOS CONSTRUCTION AUSTIN,TEXAS 78757(512)451-6334 SITE:TBZC T <br /> Tank ID: 2.3K 3 Tank manifolded: NO Bottom to top fIII In Inches: 133.0 <br /> Product: WASTE OIL Vent manifolded: no Bottom to grade in inches: 139.0 <br /> Capacity in gallons: 2, 319 Vapor recovery manifolded: no Fill pipe length in inches: 61.0 <br /> Diameter in inches: 72.00 Ovedill protection: YES Fill pipe diameter in Inches: 4.0 <br /> Length in inches: 134 Overspill protection: Yas Stage I vapor recovery: <br /> Material: OW r1ftERa Installed: ATO Stage II vapor recovery: Noma <br /> CP installed on: ! / <br /> COMMENT$ <br /> Stan(in) End(in) <br /> Dipped Water Level: 11,40 11.00 Mawlpaa Falled/raplacad New/pAsased Falled/rsplaced <br /> L.D.01 L.D.N2 L.D.#F2 <br /> Dipped Product Level: 11.00 11.00 <br /> Probe Water Level: 6-000 6.000 Make: <br /> Ingress Detected: Water N Bubble N UllageN Model: <br /> Test limey 08:51-10326 WN: <br /> Inclinometer reading: 0.00 Open time in sec: <br /> Holding psi: <br /> VacuTect Test Type: Single tank Resiliency cc: NOT NOT <br /> VacuTect Probe Entry Paint: Fill Test leak rate mVm: TEST= TZOTSDi <br /> Pressure Set Point: -1.00 Metering psi: <br /> Tank water level In Inches: 11.00 Calib.leak in gph: <br /> Water table depth in inches: Results: <br /> Determined by(method): <br /> Result: PAAS <br /> COMMENTS <br /> COMMENTS <br /> TANKS ARE D/W WITH DRY ANNULARS <br /> Material DW FXRZRO <br /> Diameter(in): 2.0 <br /> Length (ft): 40.0 <br /> Test psi: -1 <br /> Bleedback cc: 0 <br /> Test time(min): 95 NOT NOT NOT <br /> Start time: 08151 TsBTZD TasTEV Vx$T%D <br /> End time: 10s18 <br /> Final gph: 0.000 <br /> Result PASS <br /> Pump type: GRAVZTY <br /> Pump make NONN <br /> COMMENTS Impact Valves Operational <br /> Printed 02101/200013:44 <br />