Laserfiche WebLink
01/27/2000 17:11 2093651543 TANKNOLOGY PGE 04 <br /> INDIVIDUAL TANK INFORMATION AND TEST RESULTS <br /> ' <br /> TEST nATE:12/10/99 Moo SHOAL CREEK,BUILDING 200 WMK ORDER NUNMR2210731 <br /> tW34T:SAVXDGZ COMTAVCTION AUSTIN,T 7 (512)461-63M 5t =C T INC. <br /> Tank ID-. I-SK 2 Tank manifolded, No Bottam manifoldto top fill in Inches. 176.0 <br /> Product REG UNXEAID liens marifolded, NO Bottom0 grade in inches: 184.0 <br /> Capacity in gallons: 14,976 Vapot recoveiV manklielded- i i h In inches-, -0 <br /> Diameter in inches: 111.00 0yerfill p nra_ Fill pipe diameter In In . <br /> Length in inches: 3.20 chwapill protection. YES Stage I vapor : D <br /> UAL <br /> ateriai: DR 91DERG Installed: II vapor recovery, EMIAME, <br /> P installed f <br /> 77 <br /> 7'NK TEST REMJL'fS Test Method-.VaauTect',. .: <br /> start(inl EM(in) <br /> Epp Water el-. 0.0€2 0.00 t= % i <br /> Productledmploced <br /> Dipped Level, <br /> Probe Water Level, 0-000 _000 Makim vArarjass <br /> Ingress : water N BLtble X U <br /> S/N" 160177 t time- 11!13-14:24 time i e 3.00 <br /> Inclinometer r di g: 0100 Open Holding i. 40 NOT <br /> V Tect Test hype: lti a Resiliency <br /> uT Probe ry Paint: Fill Test I k TESTED <br /> Pressure Point: -0.50 meliering i® l <br /> Tank water level in inches: 0.00 Calib. teak in . � <br /> Water table depth in I salts, PASS <br /> Determined (method): <br /> Result: PASS COMMENTS <br /> E <br /> LINE TOW <br /> RESULTSwl . <br /> . A <br /> Material. ON FIBERr. <br /> Dia er(in)'. 2.0 <br /> Length(ft): 60-0 <br /> Test psi: 50 <br /> Bleedback= <br /> Test time(min), 30 NOT MOT YOT <br /> start time 11.30 TESTED TESTED USTED <br /> End time: 12:00 <br /> Final gp ' 0.000 <br /> Result PAM <br /> Pump type PRESST= <br /> Pump make <br /> COMMENTS Imped Valves Operational: YES <br /> Printed 011 22:25 <br />