Laserfiche WebLink
LG 151-3 BULK FIELD-CONSTRUCTED ...D PIPING MONITORING AND COMPIhttp•iiwww.swrcb.ca.gov/—cwphome/ust/Ig-15Lhtm <br /> x� <br /> z <br /> EMT <br /> ,6 <br /> For list of third-party certi ie equipment meeting the above criteria, refer to the LG I I t. <br /> [Enclosure 2] <br /> Monitoring Options for Single-wall Bulk Piping <br /> All the test methods and equipment used for any of the following options must have been third-party <br /> certified and meet the requirements of Section 2643W, Title 23. <br /> . Monitoring in accordance with Section 2643(c) Title 23. <br /> . Monitoring using a qualitative continuous vapor monitoring method that relies on detection of <br /> hydrocarbon vapors or an inert tracer compound outside the piping system in accordance with <br /> Section 2647 Title 23. <br /> . Quarterly monitoring using a piping monitoring method that is third-party certified to detect a <br /> minimum release equivalent to 0.1 gph defined at 150 percent the normal operating pressure. <br /> Please note that the testing may be performed at a test pressure designated by the equipment <br /> manufacturer. <br /> Back to LG list <br /> 3 of 3 1/10/00 3:24 PM <br />