My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1999-2005
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
FRANK WEST
>
120
>
2300 - Underground Storage Tank Program
>
PR0515365
>
COMPLIANCE INFO_1999-2005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/12/2021 10:06:56 AM
Creation date
6/3/2020 9:59:41 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1999-2005
RECORD_ID
PR0515365
PE
2361
FACILITY_ID
FA0012107
FACILITY_NAME
A TEICHERT & SON INC*
STREET_NUMBER
120
STREET_NAME
FRANK WEST
STREET_TYPE
CIR
City
STOCKTON
Zip
95206
APN
19342006
CURRENT_STATUS
01
SITE_LOCATION
120 FRANK WEST CIR
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0515365_120 FRANK WEST_1999-2005.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
458
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
INDIVIDUAL TANK INFORMATION AND TEST RESULTS <br /> _ .Tanknology <br /> TEST DATE:12/10/99 8900 SHOAL CREEK,BUILDING 200 WORK ORDER NUMBER2210731 <br /> CLIENT:SAVIDGE CONSTRUCTION AUSTIN,TEXAS 78757(512)451-6334 SITE:TEICHERT INC. <br /> jNF MTIO. <br /> Tank ID: 15K 2 Tank manifolded: No Bottom to top fill in inches: 176.0 <br /> Product: REG UNLEAD Vent manifolded: No Bottom to grade in inches: 184.0 <br /> Capacity in gallons: 14,976 Vapor recovery manifolded: No Fill pipe length in inches: 58.0 <br /> Diameter in inches: 118.00 Overfill protection: YES Fill pipe diameter in inches: 4.0 <br /> Length in inches: 320 Overspill protection: YES Stage I vapor recovery: DUAL <br /> Material: DW FISERG Installed: ATG Stage II vapor recovery: BALANCE <br /> CP installed on: <br /> COMMENTS <br /> .. <br /> ON"MOWN <br /> EF,EGCIRE': <br /> Start(in) End(in) <br /> New/passed Failed/replaced New/passed Failed/replaced <br /> Dipped Water Level: 0.00 0.00 <br /> L.D.#1 L.D.#1 L.D.#2 L.D.#2 <br /> Dipped Product Level: 93.00 93.00 <br /> Probe Water Level: 0.000 0.000 Make: VAPORLESS <br /> Ingress Detected: Water N Bubble N UllageN Model: LD2000 <br /> Test time: 11:3.3-14:24 S/N: 14067 <br /> Open time in sec: 3.00 <br /> Inclinometer reading: 0.00 Holding psi: ao <br /> VacuTect Test Type: Multiple tanks Resiliency cc: NOT <br /> VacuTect Probe Entry Point: Fill Test leak rate mUm: 189.0 TESTED <br /> Pressure Set Point: -0.50 Metering psi: is <br /> Tank water level in inches: 0.00 Calib. leak in gph: 3.00 <br /> Water table depth in inches: Results: PASS <br /> Determined by(method): <br /> Result: PASS COMMENTS <br /> COMMENTS <br /> Material: DW FIaERG <br /> Diameter(in): 2.0 <br /> Length (ft): 60.0 <br /> Test psi: 50 <br /> Bleedback cc: 0 <br /> Test time(min): 30 NOT NOT NOT <br /> Start time: 11:30 TESTED TESTED TESTED <br /> End time: 12:00 <br /> Final gph: 0.000 <br /> Result: PASS _ <br /> Pump type: PRESSURE <br /> Pump make: RED JACKET <br /> COMMENTS Impact Valves Operational: YES <br /> Draft 12/13/1999 08:34 MSHAW . <br />
The URL can be used to link to this page
Your browser does not support the video tag.