My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1999-2005
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
FRANK WEST
>
120
>
2300 - Underground Storage Tank Program
>
PR0515365
>
COMPLIANCE INFO_1999-2005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/12/2021 10:06:56 AM
Creation date
6/3/2020 9:59:41 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1999-2005
RECORD_ID
PR0515365
PE
2361
FACILITY_ID
FA0012107
FACILITY_NAME
A TEICHERT & SON INC*
STREET_NUMBER
120
STREET_NAME
FRANK WEST
STREET_TYPE
CIR
City
STOCKTON
Zip
95206
APN
19342006
CURRENT_STATUS
01
SITE_LOCATION
120 FRANK WEST CIR
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0515365_120 FRANK WEST_1999-2005.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
458
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TABLE OF CONTENTS <br /> SECTION 3-Containment Crossover Detail***********,24 <br /> 2.3.1 Preparation.........................................................24 <br /> PART ONE: PRIMARY PRODUCTS PIPING-RED THREAD 11A SECTION 4-Termination Connections...................25 <br /> PIPE AND FITTINGS 2.4.1 Termination at the Storage Tank.......................25 <br /> SECTION I-Storage and Handling............................4 2.4.2 Termination at the Dispenser............................25 <br /> 1.1.1 Packaging, Ordering, and 2.4.3 Termination Fittings...........................................26 <br /> Shipping Information(Table 1.1.1).....................4 SECTION 5-Secondary Containment System <br /> 1.1.2 Packaging..............................................................4 Size Reductions..........................................................26 <br /> 1.1.3 Storing..................................................................4 SECTION 6-Secondary Containment Saddles........26 <br /> 1.1.4 Transporting.........................................................4 SECTION 7-Adhesive Bonding and Curing............27 <br /> 1.1.5 Loading and Unloading.......................................4 2.7.1 Introduction.......................................................27 <br /> SECTION 2-Layout and Preparation.........................5 2.7.2 Cleaning the Bonding Surfaces..........................27 <br /> 1.2.1 Inspection.............................................................5 2.7.3 Bonding..............................................................28 <br /> 1.2.2 Installation Crew Size and Organization.............5 2.7.4 Assembling and Bolting.....................................28 <br /> SECTION 3-Tool and Equipment List.......................5 2.7.5 Precautions.........................................................28 <br /> 1.3.1 Recommended Equipment for Cool Weather 2.7.6 Adhesive Cure.....................................................28 <br /> Pipe Assembly.......................................................5 SECTION 8-Testing Recommendations for <br /> 1.3.2 Recommended Equipment for Installing Secondary Containment Piping................................29 <br /> 2"-4"Pipe..............................................................6 SECTION 9-Repairs..................................................30 <br /> SECTION 4-Joining Methods....................................6 2.9.1 Replacing Leaking Secondary <br /> 1.4.1 General Concepts.................................................6 Containment joints............................................30 <br /> 1.4.2 Bell and Spigot Joining Method...........................7 2.9.2 Repairing Minor Pipe Damage...........................31 <br /> SECTION 5-Cutting and Tapering............................7 2.9.3 Repairing Extensive Pipe Damage......................31 <br /> 1.5.1 Cutting..................................................................7 <br /> 1.5.2 Tapering................................................................8 PART THREE: TELESCOPING PIPE SYSTEM <br /> SECTION 6-Installation.............................................8 SECTION 1-RED THREAD IIA Secondary <br /> 1.6.1 Piping Layout.......................................................8 Containment Telescoping Pipe System....................31 <br /> 1.6.2 Trenching and Backfilling....................................8 3.1.1 Telescoping System ............................................31 <br /> 1.6.3 Adhesive Bonding.................................................9 3.1.2 Assembly.............................................................31 <br /> 1.6.4 Joint Assembly....................................................11 3.1.3 Description.........................................................31 <br /> 1.6.5 Adhesive Cure Time...........................................13 3.1.4 Installation.........................................................31 <br /> 1.6.6 Connecting to Other Systems............................16 <br /> 1.6.7 Flexible Hose Connections.................................16 <br /> 1.6.8 Inspecting for Potential Causes <br /> of joint Failure....................................................17 LIST OF TABLES <br /> SECTION 7-Testing Recommendations..................17 Table 1.1.1 Standard Packaging of Pipe.........................4 <br /> 1.7.1 Safety Precautions ..............................................17 Table 1.2.1 Suggested Units of Labor for <br /> 1.7.2 Test Procedures...................................................18 Installation..................................................5 <br /> 1.7.3 Air Test Procedures and Safety Precaution.........18 Table 1.3.1 Wattage Requirements for <br /> SECTION 8-Repair Procedures................................19 Electric Heating Collars...............................6 <br /> 1.8.1 Repairing Weather Damage................................19 Table 1.3.2 Extension Cord Length...............................6 <br /> 1.8.2 Pipe Patching......................................................19 Table 1.6.1 Recommended Minimum Burial Depths....8 <br /> 1.8.3 Repairing Extensive Damage..............................20 Table 1.6.2 Adhesive Kit Data......................................10 <br /> 1.8.4 Leaking Joints.....................................................21 Table 1.6.3 Adhesive Cure Times When Using <br /> Electric Heating Collars.............................14 <br /> PART TWO: SECONDARY CONTAINMENT PIPING-RED Table 1.8.1 Make-up Dimensions (Wet)......................20 <br /> THREAD 11A PIPE AND RED THREAD 11A SECONDARY COM <br /> TAINMENT FITTINGS Table 2.2.1 Determining Length of <br /> SECTION 1 -Secondary Containment Piping Containment Pipe.....................................23 <br /> System Components..................................................21 Table 2.3.1 Containment Crossover Information.......24 <br /> 2.1.1 Secondary Containment Pipe ............................21 Table 2.3.2 Pipe Separation Distances..........................24 <br /> 2.1.2 Secondary Containment Fittings.......................21 Table 2.4.1 Termination Fitting Connections.............26 <br /> 2.1.3 Adhesive for Secondary Containment Piping....21 Table 2.7.1 Number of Containment Fitting <br /> SECTION 2-System Preparation..............................22 Bonds per Adhesive Kit .............................28 <br /> 2.2.1 Piping Layout.....................................................22 <br /> 2.2.2 Pipe Preparation and Tool Set-up and Use.........22 Table 3.1.1 Sizing for Telescoping Pipe Systems..........32 <br /> 18 2.2.3 Pipe Assembly.....................................................23 Table 3.1.2 Determining Length of <br /> 2.2.4 Fitting Assembly.................................................24 Containment Pipe.....................................32 <br /> RED THREAD 11A Pipe & Fittings Do 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.