Laserfiche WebLink
Veeder-Root Line Leak Applicator Guide i <br /> 4. Locate red switch bank labeled S1 on the CPT's Controller CPU board, and verify that dip switch 2 is set to the Closed <br /> position(to enable the PLLD precision line leak function),and dip switch 8 is set to the Open position (to disable the CPT's <br /> line leak function). <br /> 5. Verify that the Rotary Pressure Dial, also on the CPT's Controller CPU board, is set to either the 2(24 psi), 3(27 psi),4 (30 <br /> psi), 5(33 psi), or 6(36 psi)position. <br /> O` 1 <br /> plld/eptplld.eps <br /> � II <br /> t I I <br /> —4 - <br /> oQ ` _ _ 'n i -- --------------- <br /> Y0 0PLLD <br /> transducer;; <br /> ® I I PLLD C0 o Only ),j <br /> transducer 0 <br /> in SwiftCheck ��' <br /> l0 O Valve :O SpikeCheck <br /> Valve Assy. <br /> 0 O Functional <br /> Element <br /> Red Jacket Standard CPT Red Jacket Quantum CPT <br /> Transducer Installation - Red Jacket Big-Flo and Maxxum Pumps <br /> -�---- BIG-FLO PUMPS <br /> 1. You will need to install a reducing tee(customer supplied)in either of the 3-inch discharge ports of the pump with the 2- <br /> inch opening facing up. If you have the room, it may be easier to install this tee between the Pressurstat kit and the unused <br /> port instead of in the discharge line(as shown in the figure below).Alternatively,the PLLD transducer can be installed in <br /> the leak detector port of a Big-Flo leak detector if it is already present in the line(as shown in the figure below). <br /> 2. Install the Red Jacket Big-Flo Pressurstat Kit(Red Jacket part number 144-314-5)following the instructions with the kit. <br /> 3. Thread the PLLD transducer into the 2-inch opening of the tee. <br /> IMPORTANT! Seal any pipe threads using a UL-classified, nontoxic pipe sealant suitable for the fuel involved. <br /> 4. Verify that the console has Version x19 or later software. <br /> Junction box <br /> OPTIONAL INSTALLATION EXAMPLE (customer supplied) <br /> 3/4"NPT Union, a <br /> 3/4"NPT nipples, PLLD transducer P o e <br /> reducing nipple / Seal-off,epoxy seal per NFPA <br /> (customer supplied) I(/ 3"discharge line spec(customer supplied) <br /> (to dispensers) <br /> � conduit to console <br /> (customer supplied) <br /> PLLD transducer in 2"port of <br /> Big-Flo Leak Detector(customer <br /> /p supplied) <br /> / Red Jacket Big-Flo "`- 3"x 3"90 degree elbow <br /> Red Jacket Big-Flo Pressurstat kit- <br /> Pressurstat kit- 2"x 2"x 3"reducing tee P/N 144-314-5 (customer supplied) <br /> P/N 144-314-5 and 3"NPT nipple (customer supplied) 3"discharge line(to dispensers) <br /> (customer supplied) (customer supplied) <br /> pll.igllol.ePs <br /> 11 <br />