My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2006-2009
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
FRANK WEST
>
120
>
2300 - Underground Storage Tank Program
>
PR0515365
>
COMPLIANCE INFO_2006-2009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/12/2021 1:42:31 PM
Creation date
6/3/2020 9:59:42 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2006-2009
RECORD_ID
PR0515365
PE
2361
FACILITY_ID
FA0012107
FACILITY_NAME
A TEICHERT & SON INC*
STREET_NUMBER
120
STREET_NAME
FRANK WEST
STREET_TYPE
CIR
City
STOCKTON
Zip
95206
APN
19342006
CURRENT_STATUS
01
SITE_LOCATION
120 FRANK WEST CIR
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
KBlackwell
Supplemental fields
FilePath
\MIGRATIONS\F\FRANK WEST\120\PR0515365\SUMP REPAIR 2008.PDF
QuestysFileName
SUMP REPAIR 2008
QuestysRecordDate
11/10/2015 5:47:54 PM
QuestysRecordID
2922518
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
362
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MAR-13-2008 09 : 10 AM GETTLER—RYAN INC. 925 551 4770 P. 06 <br /> Secondary Containment Testing Report Form-Page 5 of 5 <br /> Pass/FailThreshold or Result: Criteria: <br /> S, ail 1i;a <br /> Wt— <br /> I� Pas Fail <br /> Was leak detection sensor Yes. [] No, Yes-, 0 No: El Yes: 0 No-, <br /> properly replaced and verified aq ED Yes,ED No: <br /> functional after testina? D N/A (Not Itotiowd) N/A(Not Removed) N/A {Not Removed) N/A(Not RcmovLdi <br /> I. Testing of Spill Buckets M N/A(No spill buckets installed) <br /> 7pli I bucket(s)not tested <br /> 'rest Method Developed By: 0 Bucket MarmthCtUrer;Ej Industry Standard: JIF-, Other(Rpc?vf)5,): <br /> Test Method Used: [] Pressure; -Vacuum; C1_F'-ly—drostatic; Ej Other(Specj/i): <br /> Test Equipment Used: <br /> .quipment Resolution-, <br /> Bucket#: Bucket Bucket 4! Bucket 4: <br /> Bucket Diameter: <br /> Bucket Depth: <br /> Wait time between applying <br /> Pressure/vacuum/water and <br /> Test Start'llme, <br /> Initial heading(R,)-. <br /> Test End Time: <br /> Final Reading(R,;): <br /> angee ng(RF -RI) <br /> Pass!Fail-Fh;eshold or Criteria: <br /> Test Result: Pass; ❑ Fail Q Pam" Q Fall El Pass; El Fall C3 Pass- ® Fall <br /> J. Additional Information <br /> Were any repairs made to secondary containment systems prior to testing? ] Yes(describe in "Comments"), E] No <br /> Were any secondary containment systems unable to be tested? Cj Yes(describe in "Comments"), E] No <br /> Is any follow-up action recommended? 0 'Yes(describe in "Comments").[] No <br /> Was any cleaning of secondary containment systems done? [I Yes(describe management ol'wastewater in "Comments" ).El No <br /> If hydrostatic testing was performed, describe in "Comments"what was done with the water after completion of testing,. <br /> Comments: Water placed Into an site hazard waste drum UDC 1/2 No repairs made.Only tested UDC 1/2 No others required <br />
The URL can be used to link to this page
Your browser does not support the video tag.